Product life cycle

Definition

In PMI usage the product life cycle describes how a product evolves from the idea through development, introduction, growth and maturity to decline and retirement. It is usually considerably longer than any single project. Several projects can take place within one product life cycle: one develops the product, others extend it, adapt it to new regulations or withdraw it from the market in an orderly way. PMI stresses that project decisions should take the whole life cycle into account, because maintainability, operating costs and disposal often cost more than development itself.

Equivalents in other frameworks

Concept Path of a product from idea to retirement · one framework reviewed

Equivalents of Product life cycle in other frameworks
FrameworkTerm thereRelationNote
generalProduct life cycleequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Product life cycle
Topic area
Fundamentals

Distinction

The project life cycle covers only the phases of a single project and ends when that project closes; the product life cycle includes operation and use. The cross-framework term product life cycle refers to the same thing. In marketing the term is used more narrowly for the sales curve on the market; PMI, by contrast, explicitly includes development and retirement.

In practice

A medical device manufacturer plans a new infusion system. The development project already specifies how software updates will be delivered over ten years and how old devices will be taken back. Three years later a second project adds a wireless interface; a third project later organizes the end of spare-parts supply.

Frequently asked questions

Who is responsible for the product life cycle?

Usually product management in the line organization. Projects contribute to individual stages but are not responsible for the whole cycle.

Why should a project think beyond its own end?

Because decisions taken during development determine later costs and risks in operation. A cheap solution within the project can become considerably more expensive over the period of use.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Product life cycle. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/product-life-cycle-pmi/

Short form

Product life cycle (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/product-life-cycle-pmi/ (retrieved 24 November 2026)

BibTeX
@misc{productlifecyclepmi,
  title   = {Product life cycle},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/product-life-cycle-pmi/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/product-life-cycle-pmi/">
  <p>The stages a product goes through over its whole existence, from initial concept via launch, growth and maturity to withdrawal.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/product-life-cycle-pmi/">Product life cycle</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.