Burndown chart

Definition

In PMI usage a burndown chart plots the work still to be done in a timebox against the time remaining. The horizontal axis shows time, for example the days of an iteration; the vertical axis shows the outstanding work, measured for instance in story points, hours or number of tasks. An ideal line shows how the remaining work would fall with steady progress; the actual line is updated regularly, usually daily. If it lies well above the ideal line, the team is at risk of missing its goal for the timebox. The chart serves mainly the team’s self-management and transparency towards stakeholders.

Equivalents in other frameworks

Concept Chart of remaining work over time · one framework reviewed

Equivalents of Burndown chart in other frameworks
FrameworkTerm thereRelationNote
generalBurn-down chartequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Burndown chart

Distinction

The cross-framework term burn-down chart refers to the same diagram. A burnup chart instead shows the work already completed and makes changes to the overall scope visible, which appear as unexplained jumps in a burndown chart. Unlike an S-curve from earned value analysis, the burndown chart does not depict costs.

In practice

A team has planned 40 story points for a two-week iteration. After six working days the burndown chart still shows 32 open points, while the ideal line is at 16. In the daily coordination meeting it emerges that an interface is blocked. The team brings in a colleague and discusses with the person responsible for the product which story could be dropped if necessary.

Frequently asked questions

In what unit is remaining work measured?

The team decides. Story points, estimated hours or the number of open tasks are common. What matters is not to change the unit within a timebox.

Can a burndown chart be used for whole releases?

Yes, as a release burndown across several iterations. There, however, scope changes more often, which is why many teams prefer a burnup chart for longer periods.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Burndown chart. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/burndown-chart/

Short form

Burndown chart (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/burndown-chart/ (retrieved 24 November 2026)

BibTeX
@misc{burndownchart,
  title   = {Burndown chart},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/burndown-chart/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/burndown-chart/">
  <p>Chart plotting how much work is still open against the time remaining in a timebox, so the team can see whether it will finish.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/burndown-chart/">Burndown chart</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.