Activity-on-arrow network
also: Arrow diagramming method · abbr. AOA, ADM
Definition
In an activity-on-arrow network, each arrow stands for an activity; its start node and end node mark the points in time at which it begins and ends. Where several arrows meet at a node, all preceding activities must be complete before the outgoing ones can start. This representation was originally used for the critical path method.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Classification
- this term
- Activity-on-arrow network
- Topic area
- Network planning
Distinction
Unlike the activity-on-node network, only finish-to-start relationships can be shown directly. To represent complex dependencies correctly, the activity-on-arrow network needs dummy activities without duration. In the English-speaking world the form is known as the arrow diagramming method or activity on arrow.
In practice
In a university lecture, students draw an activity-on-arrow network for a house renovation. Plastering depends only on the electrical work, while the plumbing runs in parallel; painting follows only plastering, while tiling also depends on the plumbing. This cannot be drawn correctly without a dummy activity. The example helps the students understand why practitioners today work almost exclusively with activity nodes.
Frequently asked questions
Is the activity-on-arrow network still used today?
Rarely in practice, more often in teaching and in older documents. Scheduling software almost always works with activity nodes.
What do the nodes in an activity-on-arrow network stand for?
For events, that is, points in time at which activities end and new ones begin. The nodes themselves have no duration.
Source and context
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Activity-on-arrow network. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/activity-on-arrow-network/
Hain, D. (n.d.): Activity-on-arrow network. PMDecoder. https://pmdecoder.com/en/glossary/activity-on-arrow-network/ (retrieved 24 November 2026)
@misc{activityonarrownetwork,
author = {Hain, Dennis},
title = {Activity-on-arrow network},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/activity-on-arrow-network/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/activity-on-arrow-network/"> <p>Form of network schedule in which activities are shown as arrows and the points in time between them as nodes</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/activity-on-arrow-network/">Activity-on-arrow network</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.