Output
Definition
In PMI usage, output refers to what a process, activity or project produces: a product, a result or a service. In PMI’s process-oriented descriptions every process has inputs and outputs; the output of one process is often the input to the next, for example when an approved change request feeds into updating the plan. At project level, outputs are the tangible products the team hands over, such as software, a building, a report or a trained workforce. Outputs can usually be checked and accepted at handover, as they clearly either exist or do not.
Equivalents in other frameworks
Concept Direct result of an initiative · one framework reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| ISO 21506 | Output | closely related | product of a single process or activity, not necessarily everything a project delivers |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
All designations of this concept side by side
Comparisons
Classification
- this term
- Output
- Topic area
- Fundamentals
Distinction
A deliverable is an output that is explicitly specified in a contract or plan as something to be delivered; not every output of a process is a deliverable. The outcome describes the change that only occurs through the use of outputs. The ISO term output refers to the same stage of the value chain. PMI additionally uses the word in its technical sense of a process output.
In practice
In a project to introduce time recording, the requirements elicitation process produces an agreed list of requirements as its output, which feeds into the invitation to tender. At the end the project delivers as outputs the configured system, the interface to payroll and the training material. Whether employees actually record their time more reliably only becomes clear in operation.
Frequently asked questions
Is delivering all outputs enough?
For formal acceptance it often is, but not necessarily for project success. A project can deliver every output on time and still fail if the outputs are not used or the expected outcome does not materialize.
How do outputs relate to work packages?
In the work breakdown structure each work package is geared to one or more outputs. Decomposing by results rather than by activities makes it easier to tie progress to tangible products.
Source and context
- Reference
- PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition
- PMBOK Guide – Eighth Edition
Cite this entry
Output. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/output-pmi/
Output (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/output-pmi/ (retrieved 24 November 2026)
@misc{outputpmi,
title = {Output},
note = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
url = {https://pmdecoder.com/en/glossary/output-pmi/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/output-pmi/"> <p>Direct product of a process or activity, such as a report, software or a service, that often feeds into the next process.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/output-pmi/">Output</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer> </blockquote>
Found a mistake? Let us know, we check every report.