Scrum Event

Definition

Scrum Events are the fixed occasions of the framework. The Scrum Guide names five: the Sprint as the container for all the others, plus Sprint Planning, Daily Scrum, Sprint Review and Sprint Retrospective. Each event is a planned opportunity to inspect artifacts and adapt them where necessary, and it creates the transparency needed for this. Because the events take place regularly and, where possible, always on a fixed schedule and in a fixed location, they are meant to make other meetings largely unnecessary. Each event has a timebox, a maximum duration based on a one-month Sprint. A team that skips an event gives up an opportunity to learn.

Equivalents in other frameworks

No equivalents have been recorded for this term yet.

Classification

this term
Scrum Event

Distinction

Refinement is an ongoing activity alongside the other work and is not an event. Nor are cross-team planning rounds or estimation workshops part of Scrum, even though many organizations add them. The official German translation writes Scrum Events without a hyphen because it keeps the fixed elements of Scrum in English.

In practice

A team that develops a merchandise management system in two-week Sprints puts all events into a fixed calendar: Sprint Planning on the first Monday from 9 a.m. to 12 noon, the Daily Scrum every day at 9.30 a.m., and Sprint Review and Retrospective on the second Friday afternoon. Once the rhythm is established, the department drops two weekly coordination meetings whose topics are now dealt with in the events.

Frequently asked questions

Why is the Sprint counted among the events?

The Sprint is itself an event with a fixed length. It contains the four other events and all remaining work on the product.

May an event be shorter than its timebox?

Yes. The timebox is an upper limit. For Sprints shorter than one month, the events are usually correspondingly shorter.

Source and context

Reference
Scrum Guide 2020, Abschnitt Scrum Events
Edition
Scrum Guide 2020
Cite this entry
APA

Hain, D. (n.d.). Scrum Event. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/scrum-event/

Short form

Hain, D. (n.d.): Scrum Event. PMDecoder, entry on Scrum Guide 2020, Abschnitt Scrum Events. https://pmdecoder.com/en/glossary/scrum-event/ (retrieved 24 November 2026)

BibTeX
@misc{scrumevent,
  author  = {Hain, Dennis},
  title   = {Scrum Event},
  note    = {PMDecoder, Scrum Guide 2020, Abschnitt Scrum Events},
  url     = {https://pmdecoder.com/en/glossary/scrum-event/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/scrum-event/">
  <p>One of the five fixed events in Scrum that enable inspection and adaptation: the Sprint and the four events within it</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/scrum-event/">Scrum Event</a>, PMDecoder, Scrum Guide 2020, Abschnitt Scrum Events</footer>
</blockquote>

Found a mistake? Let us know, we check every report.