Cost-reimbursable contract

Definition

Under a cost-reimbursable contract, the seller receives from the buyer the costs actually incurred and allowable under the contract. In addition, there is a fee that represents the seller’s profit. PMI distinguishes common forms: cost plus fixed fee with a fixed fee, cost plus incentive fee with a fee that depends on meeting agreed cost or performance targets, and cost plus award fee, where the buyer determines the fee based on its assessment of performance. This contract type is suitable when the scope is uncertain at the outset or likely to change significantly.

Equivalents in other frameworks

Concept Contract reimbursing actual costs · three frameworks reviewed

Equivalents of Cost-reimbursable contract in other frameworks
FrameworkTerm thereRelationNote
generalCost-reimbursable contractequivalent—
Scrum—no counterpart—
Kanban—no counterpart—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Cost-reimbursable contract

Distinction

The PMI term is equivalent to the concept described in the glossary under “Kostenerstattungsvertrag” (cost-reimbursable contract). Under a fixed-price contract the seller bears the cost risk, under a cost-reimbursable contract mainly the buyer. The time and materials contract lies in between and charges agreed rates for time and materials.

In practice

A research institute commissions a specialist firm to build a prototype whose technical solution is still open. The parties agree on reimbursement of documented costs plus a fixed fee. The client requires monthly cost reports with receipts and reserves the right to audit the accounts in order to check that the costs are allowable.

Frequently asked questions

What risk does the buyer bear under a cost-reimbursable contract?

The buyer bears the risk of rising costs, because all allowable costs are reimbursed. It therefore needs insight into cost development and clear rules on which costs are reimbursable.

What is the purpose of an incentive fee?

It gives the seller a reason to keep costs down or exceed performance targets. Buyer and seller share savings or overruns according to an agreed formula.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Cost-reimbursable contract. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/cost-reimbursable-contract-pmi/

Short form

Cost-reimbursable contract (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/cost-reimbursable-contract-pmi/ (retrieved 24 November 2026)

BibTeX
@misc{costreimbursablecontractpmi,
  title   = {Cost-reimbursable contract},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/cost-reimbursable-contract-pmi/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/cost-reimbursable-contract-pmi/">
  <p>Contract type in which the buyer pays the seller’s allowable actual costs and, on top, a fee that represents profit.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/cost-reimbursable-contract-pmi/">Cost-reimbursable contract</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.