Value stream mapping
Definition
In value stream mapping, a value stream is observed on site and drawn with simple symbols: process steps, inventories or queues between them, the information flow of orders and planning, and a timeline. On the timeline, processing times are set against waiting times; this shows what share of the lead time actually creates value. The method became widely known in the late 1990s through the book Learning to See by Mike Rother and John Shook. The analysis of the current state is usually followed by a future-state map, the design of an improved target state with an implementation plan.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Other terms
Other words for the same thing in English usage. Not to be confused with the equivalents above, which translate between frameworks.
- Value stream design
- related, not equivalent
Distinction
Value stream mapping follows one result across all stations; a process diagram or flowchart, by contrast, usually shows only sequence and branches, without times and inventories. It must not be confused with value analysis, which sets the functions of a product against their costs. Root cause analysis starts from a single problem, value stream mapping from the entire process.
In practice
The IT department of a city administration needs about 25 working days to set up a workstation for new employees. A small team draws on a pinboard the steps from the request by the HR department to the fully configured computer and records processing and waiting times for each step. The map shows that three approvals run one after the other instead of at the same time. In the future-state design they are combined, and the lead time drops to eight days.
Frequently asked questions
Do you need software for value stream mapping?
No. It is common to start on site with paper, pencil and sticky notes. Software may help later with documentation, but it does not replace observing the actual process.
What is the difference between current-state and future-state mapping?
The current-state map describes how the process actually runs today. The future-state map uses it to design a target state with fewer waiting times and handovers and sets out the steps to get there.
Source and context
Cite this entry
Value stream mapping. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/value-stream-mapping/
Value stream mapping (n.d.). PMDecoder. https://pmdecoder.com/en/glossary/value-stream-mapping/ (retrieved 24 November 2026)
@misc{valuestreammapping,
title = {Value stream mapping},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/value-stream-mapping/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/value-stream-mapping/"> <p>Tool for depicting the current state of a value stream, with material and information flow, times and inventories, on a single map.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/value-stream-mapping/">Value stream mapping</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.