Bill of quantities

abbr. BoQ

Definition

A bill of quantities (Leistungsverzeichnis) breaks construction work or comparable work down into individual items, for example “sand-lime brick masonry, 17.5 centimetres, 240 square metres”. Each item describes the type and quality of the work and states the quantity and unit. Bidders enter unit rates, from which the bid price is derived. In Germany, the GAEB format is widely used for electronic exchange.

Equivalents in other frameworks

No equivalents have been recorded for this term yet.

Classification

this term
Bill of quantities

Distinction

The statement of work (Leistungsbeschreibung) is the generic term; the bill of quantities is its structured, item-by-item form. A performance specification (funktionale Leistungsbeschreibung) states only requirements and leaves the items to the bidder. The bill of materials lists the components of a product, the bill of quantities the work to be carried out.

In practice

For the refurbishment of a sports hall, the architects draw up bills of quantities for each trade. In the floor covering trade, the item for removing the old covering is initially missing. A bidder points this out in a query, and all bidders receive an addendum. Had the item remained missing, it would later have been billed as a change order, usually at higher prices than under competition.

Frequently asked questions

Who prepares the bill of quantities?

Usually the design office on behalf of the client, based on the detailed design and quantity take-offs.

What happens if quantities differ?

Under unit-price contracts, billing is based on the quantities actually carried out. How larger deviations are to be handled is governed by the contract.

Source and context

Cite this entry
APA

Hain, D. (n.d.). Bill of quantities. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/bill-of-quantities/

Short form

Hain, D. (n.d.): Bill of quantities. PMDecoder. https://pmdecoder.com/en/glossary/bill-of-quantities/ (retrieved 24 November 2026)

BibTeX
@misc{billofquantities,
  author  = {Hain, Dennis},
  title   = {Bill of quantities},
  note    = {PMDecoder},
  url     = {https://pmdecoder.com/en/glossary/bill-of-quantities/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/bill-of-quantities/">
  <p>Structured list of the work to be performed, broken down into individual items with description, quantity and unit, mainly in construction</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/bill-of-quantities/">Bill of quantities</a>, PMDecoder</footer>
</blockquote>

Found a mistake? Let us know, we check every report.