Issue register
Definition
The issue register is the working tool for everything that has already happened in the project and needs to be resolved. Each entry describes the issue, its effects and its priority, names an owner and a target date, and documents the agreed actions, decisions and current status. It is reviewed in regular meetings; closed issues remain in the register together with their resolution.
Equivalents in other frameworks
Concept Register of issues · two frameworks reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK | Issue log | equivalent | — |
| PRINCE2 | Issue Register | closely related | Holds only issues handled formally; informally handled matters are kept in the Daily Log. Requests for change are one type of issue. |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
All designations of this concept side by side
Comparisons
Classification
- this term
- Issue register
- Topic area
- Monitoring and control
Distinction
The risk register contains events that might occur, the issue register those that already have. A task list manages planned work, the issue register unexpected matters that need clarifying. The change register records changes to the agreed undertaking, which often, but not always, result from issues.
In practice
During the commissioning of a wastewater treatment plant, site management keeps an issue register that most recently contains 64 entries, ranging from missing test certificates to a pump that shuts down during heavy rain. Every Tuesday, site management, the manufacturer and the operator go through the register. High-priority issues that see no progress for two weeks are reported to the project manager. At acceptance, the register serves as evidence of which defects have been remedied.
Frequently asked questions
What belongs in an issue register?
At least an identifier, description, date raised, priority, owner, target date, actions and status. Many projects add the effects on schedule and cost.
When is an issue closed?
When the agreed resolution has been implemented and confirmed by the person who raised the issue or who is responsible for it. The closure is documented with its date.
Source and context
- Reference
- ISO 21506:2024, 3.32
- Edition
- ISO 21506:2024
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Issue register. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/issue-register/
Hain, D. (n.d.): Issue register. PMDecoder, entry on ISO 21506:2024, 3.32. https://pmdecoder.com/en/glossary/issue-register/ (retrieved 24 November 2026)
@misc{issueregister,
author = {Hain, Dennis},
title = {Issue register},
note = {PMDecoder, ISO 21506:2024, 3.32},
url = {https://pmdecoder.com/en/glossary/issue-register/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/issue-register/"> <p>Document in which all issues of a project or programme are recorded together with actions, owners and status.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/issue-register/">Issue register</a>, PMDecoder, ISO 21506:2024, 3.32</footer> </blockquote>
Found a mistake? Let us know, we check every report.