Rework
Definition
Rework corrects defects in a result that has already been produced, such as regrinding a component, relaying a faulty cable or revising a document after a review. It causes additional effort and costs that are rarely provided for in the plan, and it often delays subsequent work. If it takes place before handover, it counts as an internal failure cost.
Equivalents in other frameworks
Concept Correcting a defective result · one framework reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK | Rework | equivalent | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Rework
- Topic area
- Quality
Distinction
As understood in ISO 9000, rework brings a defective result into a state that conforms to the requirements, whereas repair merely makes it usable for its intended use without all requirements being met. A corrective action removes the cause, rework only the individual defect. Scrap is when a result can be neither reworked nor repaired.
In practice
During the interior fit-out of an office building, the site manager finds that the sockets on two floors are too low because an outdated drawing was used. The rework involves opening the walls, moving the sockets and filling and painting again, eight working days in total. At the same time, the project manager ensures that only approved drawing revisions are available on site, so that the error does not recur.
Frequently asked questions
How can rework be reduced?
Through clear requirements, up-to-date documents, early interim checks and the consistent removal of the causes of defects.
Should rework be taken into account in the schedule?
Experience from earlier projects often justifies a reserve for it. It is important to record rework separately so that its extent becomes visible.
Source and context
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Rework. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/rework/
Hain, D. (n.d.): Rework. PMDecoder. https://pmdecoder.com/en/glossary/rework/ (retrieved 24 November 2026)
@misc{rework,
author = {Hain, Dennis},
title = {Rework},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/rework/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/rework/"> <p>Action on a defective result that changes it so that it does meet the specified requirements after all</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/rework/">Rework</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.