Control phase

Definition

In the Control phase the team ensures that the improvement remains in place after the project ends. The new procedures are documented as the standard, the people involved are trained, and a control plan sets out which measures continue to be monitored, how often and who does what in case of deviations. Control charts are often introduced for important measures. After an observation period, the team checks whether results are stable and the financial benefit is materializing. The process owner then takes over monitoring, the team records its lessons, and the final tollgate closes the project.

Equivalents in other frameworks

Concept Closing stage of a project · five frameworks reviewed

Equivalents of Control phase in other frameworks
FrameworkTerm thereRelationNote
PRINCE2Closing a projectclosely relatedProcess within the final stage rather than a stage of its own; also used for premature closure.
PM²Closing Phaseclosely relatedfixed phase after the Ready for Closing phase gate, with the Project-End Report
generalProject closureclosely relatedCloses the project, but focuses on securing the improvement for the long term and handing it over to the process owner.
Scrum—no counterpart—
Kanban—no counterpart—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

Broader term
DMAIC
this term
Control phase
Topic area
Closing

Distinction

The Control phase includes project closure but goes further: its focus is the lasting management of the improved process, not just the orderly ending of the project. “Control” here means steering and securing the process, not checking in the sense of an inspection.

In practice

After introducing a new checklist for claims, an insurer’s team decides that lead time will be evaluated weekly. If it exceeds twelve days three weeks in a row, the team leader investigates the cause. After three stable months the Black Belt hands monitoring over to the head of department, and the champion confirms closure.

Frequently asked questions

Why is the Control phase so important?

Without safeguards, processes often fall back into old habits once the project team turns to other tasks. The phase turns the improvement into normal operation.

How long is the process observed after introduction?

The organization and project decide. Observation should be long enough to include typical fluctuations such as month-end or seasonal peaks.

Source and context

Reference
ISO 13053-1:2011
Edition
ISO 13053-1:2011 (DMAIC methodology)
Cite this entry
APA

Control phase. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/control-phase/

Short form

Control phase (n.d.). PMDecoder, entry on ISO 13053-1:2011. https://pmdecoder.com/en/glossary/control-phase/ (retrieved 24 November 2026)

BibTeX
@misc{controlphase,
  title   = {Control phase},
  note    = {PMDecoder, ISO 13053-1:2011},
  url     = {https://pmdecoder.com/en/glossary/control-phase/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/control-phase/">
  <p>Final DMAIC phase: the improvement achieved is secured, handed over to the process owner and the project is closed.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/control-phase/">Control phase</a>, PMDecoder, ISO 13053-1:2011</footer>
</blockquote>

Found a mistake? Let us know, we check every report.