Output
Definition
The output is the combined result of an undertaking. It includes tangible things such as a building, a machine or software as well as intangible ones, such as a new organizational structure, trained employees or a concept. Whether the output is complete can be checked against the agreed deliverables. Its value, however, is only determined by what happens with it, that is, by the outcome and the benefit that follows.
Equivalents in other frameworks
Concept Direct result of an initiative · one framework reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK | Output | closely related | product of a single process or activity, not necessarily everything a project delivers |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
All designations of this concept side by side
Comparisons
Classification
- this term
- Output
- Topic area
- Fundamentals
Distinction
A deliverable is a single, verifiable element; the output is the sum of all deliverables. The outcome is the change that arises from using the output. Projects are often measured by their output, programmes mainly by outcomes and benefits.
In practice
A district equips its schools with digital technology. The output comprises 1,800 tablets, 240 interactive whiteboards, Wi-Fi in all buildings and training for teachers. At acceptance, everything has been delivered and installed, and the project is considered successfully completed. Whether teaching changes is examined separately by the district a year later, because that is no longer part of the project.
Frequently asked questions
Is a good output automatically a success?
No. An output can be delivered completely and on time and still go unused. Success in the wider sense only shows in the outcome and the benefit.
Does training count as output?
Yes, if it has been agreed as a deliverable. Intangible results such as qualifications or procedures are just as much part of the output as equipment or buildings.
Source and context
- Reference
- ISO 21506:2024, 3.42
- Edition
- ISO 21506:2024
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Output. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/output/
Hain, D. (n.d.): Output. PMDecoder, entry on ISO 21506:2024, 3.42. https://pmdecoder.com/en/glossary/output/ (retrieved 24 November 2026)
@misc{output,
author = {Hain, Dennis},
title = {Output},
note = {PMDecoder, ISO 21506:2024, 3.42},
url = {https://pmdecoder.com/en/glossary/output/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/output/"> <p>What a project or programme ultimately delivers: all its deliverables taken together, whether objects, documents or services.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/output/">Output</a>, PMDecoder, ISO 21506:2024, 3.42</footer> </blockquote>
Found a mistake? Let us know, we check every report.