Late start date

also: Late start · abbr. LS

Definition

The late start date, LS for short, results from the backward pass by subtracting the duration from the late finish date. If an activity starts after this date and its duration remains unchanged, the project end or a specified interim date moves back. For activities on the critical path, the late start coincides with the early start date.

Equivalents in other frameworks

Concept Latest allowable start of an activity · three frameworks reviewed

Equivalents of Late start date in other frameworks
FrameworkTerm thereRelationNote
PMI / PMBOKLate start dateequivalent—
Scrum—no counterpart—
Kanban—no counterpart—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Late start date

Distinction

The early start date gives the earliest possible start, the late start the last permissible one. Their difference is the total float. If an activity is only started on its late start date, it uses up all its float, and the successors on the same path have correspondingly less room to manoeuvre.

In practice

A city administration is introducing a new fee regulation at the beginning of the year. The printer needs four weeks for the notices, and dispatch must be completed by mid-December. The backward pass shows that the print order must be placed by 10 November at the latest. The office enters this date as the latest deadline and thus also knows that the council decision must be available by then.

Frequently asked questions

What happens if an activity starts after its late start date?

With the same duration, the project end moves back, unless the delay is made up by accelerating other activities.

Should activities be scheduled on their late start date?

Only for good reason, for example if an early start would tie up material unnecessarily long. Anyone who deliberately starts late gives up any reserve for the unexpected.

Source and context

Cite this entry
APA

Hain, D. (n.d.). Late start date. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/late-start-date/

Short form

Hain, D. (n.d.): Late start date. PMDecoder. https://pmdecoder.com/en/glossary/late-start-date/ (retrieved 24 November 2026)

BibTeX
@misc{latestartdate,
  author  = {Hain, Dennis},
  title   = {Late start date},
  note    = {PMDecoder},
  url     = {https://pmdecoder.com/en/glossary/late-start-date/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/late-start-date/">
  <p>Latest point in time at which an activity may start without endangering the planned project end</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/late-start-date/">Late start date</a>, PMDecoder</footer>
</blockquote>

Found a mistake? Let us know, we check every report.