Design thinking
Definition
Design thinking does not start with a solution but with the question of what users really need. Interdisciplinary teams observe and interview those affected, reframe the actual problem, develop many ideas, build simple prototypes and test them early. The steps are not passed through strictly in sequence but in loops, until a solution appears desirable, feasible and economically viable.
Equivalents in other frameworks
Concept User-centred development of solutions · one framework reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK | Design thinking | equivalent | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Design thinking
- Topic area
- Approaches and agility
Distinction
Design thinking is an approach to problem-solving and idea development, not a project management approach; its results often feed into projects. Agile approaches implement solutions step by step, while design thinking clarifies beforehand which solution makes sense at all. Creativity techniques are tools used within design thinking.
In practice
An electricity supplier wants to improve its online customer portal and initially plans new functions. Instead, a design thinking team visits customers at home and observes how they deal with their bills. It turns out that many mainly want to understand why their instalment payment has gone up. A paper prototype of an easy-to-understand consumption explanation is tested with ten customers and revised in three rounds before implementation begins.
Frequently asked questions
When is design thinking worthwhile?
When the problem is unclear, little is known about user needs or new products and services are to be developed.
How long does a design thinking process take?
Anything from a workshop lasting several days to several months, depending on the scope of the question and the number of test loops.
Source and context
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Design thinking. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/design-thinking/
Hain, D. (n.d.): Design thinking. PMDecoder. https://pmdecoder.com/en/glossary/design-thinking/ (retrieved 24 November 2026)
@misc{designthinking,
author = {Hain, Dennis},
title = {Design thinking},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/design-thinking/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/design-thinking/"> <p>User-centred innovation approach that solves problems through understanding users, ideation, prototyping and testing in repeated loops</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/design-thinking/">Design thinking</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.