Project life cycle

Definition

In PMI usage the project life cycle is the sequence of phases a project goes through from beginning to end. It provides the framework within which the project is planned, controlled and connected to the organization. PMI does not prescribe how many phases there are, what they are called or whether they run sequentially or overlap; this depends on the industry, the organization and the undertaking. The design of the life cycle is closely linked to the chosen development approach: a predictive life cycle arranges phases such as concept, design, build and handover one after another, while an adaptive life cycle repeats short cycles, each producing a usable part. Mixed forms are common.

Equivalents in other frameworks

Concept Sequence of phases from project start to finish · one framework reviewed

Equivalents of Project life cycle in other frameworks
FrameworkTerm thereRelationNote
ISO 21506Project life cycleequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Project life cycle
Topic area
Fundamentals

Distinction

The ISO term project life cycle describes the same thing. The product life cycle is broader and extends beyond the end of the project into operation and retirement. The project life cycle differs from the development life cycle, which PMI uses for the phases of product creation within the project, in that it also covers start-up and closure.

In practice

A construction company divides the construction of a new school into the phases feasibility, design, permitting, construction and handover. At the end of each phase the client decides whether to continue. Within the construction phase the team works on the interior fittings in two-week sections with feedback from the school management, because its wishes only become clear through discussion.

Frequently asked questions

Does PMI prescribe a fixed project life cycle?

No. PMI describes design options and examples but leaves the specific phase structure to the organization and the individual project.

Why does the life cycle matter for control?

Phase boundaries offer natural decision points. There it can be checked whether the project still makes sense before further resources are committed.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Project life cycle. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/project-life-cycle-pmi/

Short form

Project life cycle (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/project-life-cycle-pmi/ (retrieved 24 November 2026)

BibTeX
@misc{projectlifecyclepmi,
  title   = {Project life cycle},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/project-life-cycle-pmi/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/project-life-cycle-pmi/">
  <p>Division of a project's lifetime into phases, from start to close, whose number and overlap depend on the undertaking and approach.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/project-life-cycle-pmi/">Project life cycle</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.