Tailoring

Definition

In PM², tailoring means adapting the methodology to an organization, its structure, culture, processes and policies. One or more of the four pillars can be changed in the process: the governance model, the life cycle, the processes or the artefacts, for example by adding steps, removing sections or distributing responsibilities differently. Tailoring is most useful at the level of the organization or department, but it can also concern an individual project. The guide recommends first understanding what an element is for and what it contributes, reducing its scope rather than removing entire parts, and recording all adaptations in the Project Handbook.

Equivalents in other frameworks

Concept Adapting the method to the undertaking · one framework reviewed

Equivalents of Tailoring in other frameworks
FrameworkTerm thereRelationNote
PRINCE2Tailor to suit the projectclosely relatedIn PRINCE2 a mandatory principle; the seven principles themselves may not be dropped.

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Tailoring

Distinction

The German edition of the guide distinguishes tailoring from adaptation in the narrower sense (Anpassung): adaptation means setting parameters such as thresholds and scales and making minor changes to templates, while tailoring means changing the methodology itself. In chapter 3.6, however, the two words are also used interchangeably.

In practice

A small agency with few projects decides that for internal projects the Solution Provider and the Project Owner may be the same person, and that the Deliverables Acceptance Management Plan is included as a section of the Project Charter. It documents both deviations in a Project Handbook template that all projects adopt.

Frequently asked questions

Where are adaptations of the methodology documented?

In the Project Handbook and, where affected, in the project's management plans.

What are the limits of tailoring?

The methodology is designed as a coherent whole. Adaptations should remain consistent with the four pillars and the Mindsets and avoid unnecessary deviations.

Source and context

Reference
PM²-Leitfaden 3.1, Abschnitt 3.6 und Anhang G
Edition
PM² Guide 3.1
Cite this entry
APA

Tailoring. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/tailoring/

Short form

Tailoring (n.d.). PMDecoder, entry on PM²-Leitfaden 3.1, Abschnitt 3.6 und Anhang G. https://pmdecoder.com/en/glossary/tailoring/ (retrieved 24 November 2026)

BibTeX
@misc{tailoring,
  title   = {Tailoring},
  note    = {PMDecoder, PM²-Leitfaden 3.1, Abschnitt 3.6 und Anhang G},
  url     = {https://pmdecoder.com/en/glossary/tailoring/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/tailoring/">
  <p>In PM², adapting the methodology to an organization's environment and needs, for example by changing roles, process steps or artefacts</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/tailoring/">Tailoring</a>, PMDecoder, PM²-Leitfaden 3.1, Abschnitt 3.6 und Anhang G</footer>
</blockquote>

Found a mistake? Let us know, we check every report.