Bill of materials

abbr. BOM

Definition

A bill of materials lists which individual parts, assemblies and raw materials are needed for a product and in what quantity. It can be single-level, showing only the direct components, or a multi-level structured bill of materials covering the entire product structure over several levels. Bills of materials are the basis for design, procurement, manufacturing, costing and service and are usually maintained in engineering or enterprise resource planning systems.

Equivalents in other frameworks

No equivalents have been recorded for this term yet.

Classification

this term
Bill of materials

Distinction

The bill of materials breaks a product down into its components; the work breakdown structure breaks down the work of a project. Both are hierarchical, and in development projects the product structure can shape the structure of the work breakdown structure. A bill of quantities in construction lists work items and quantities; a bill of materials lists parts and materials.

In practice

A manufacturer of e-bikes is developing a new model. Engineering maintains a multi-level bill of materials with frame, drive, battery, electronics and around 280 individual parts. Based on it, purchasing orders parts with long lead times such as motors and battery cells early, and project controlling continuously calculates the manufacturing costs. When a battery cell is no longer available, the bill of materials shows at once which assemblies and documents are affected.

Frequently asked questions

What types of bill of materials are there?

Common types are summarized, multi-level and single-level (modular) bills of materials, plus versions for engineering, manufacturing and service.

Why is the bill of materials important for projects?

Because it links procurement, costs and changes: every design change affects purchasing, manufacturing and costing via the bill of materials.

Source and context

Cite this entry
APA

Hain, D. (n.d.). Bill of materials. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/bill-of-materials/

Short form

Hain, D. (n.d.): Bill of materials. PMDecoder. https://pmdecoder.com/en/glossary/bill-of-materials/ (retrieved 24 November 2026)

BibTeX
@misc{billofmaterials,
  author  = {Hain, Dennis},
  title   = {Bill of materials},
  note    = {PMDecoder},
  url     = {https://pmdecoder.com/en/glossary/bill-of-materials/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/bill-of-materials/">
  <p>Structured list of all components, assemblies and materials that make up a product, with quantities and identifiers</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/bill-of-materials/">Bill of materials</a>, PMDecoder</footer>
</blockquote>

Found a mistake? Let us know, we check every report.