Forecast
Definition
In PMI usage, a forecast is an assessment of how a project is likely to develop, based on the information available when it is prepared. It typically concerns cost, schedule, resource needs or the achievable scope. Forecasts are updated regularly during execution as new performance data become available. They can be based on earned value indicators, trend observations, re-estimates of the remaining work or, in agile approaches, a team's throughput so far. A forecast is not a commitment but a reasoned expectation that prepares decisions.
Equivalents in other frameworks
Concept Estimate of final dates and costs · one framework reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| general | Project forecast | closely related | can refer to any future quantity, not only the finish date and final cost |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
All designations of this concept side by side
Comparisons
Classification
- this term
- Forecast
- Topic area
- Monitoring and control
Distinction
The closest cross-framework term for the concept is project forecast. The PMI term is somewhat broader because it covers not only the final date and final cost but any outlook on future conditions and events. An estimate usually concerns a single quantity before or during planning, whereas a forecast condenses the current status into a statement about the end. Estimate at completion and estimate to complete are specific forms of a cost forecast.
In practice
In a construction project for a logistics centre, project controls produce a forecast every month. Schedule and progress data show that handover is likely to be three weeks later than planned, and total cost is expected to be four percent over budget. The forecast states its assumptions, such as the delivery time of the conveyor system, and gives a range. On this basis the steering committee decides on additional shifts.
Frequently asked questions
How often should a forecast be updated?
In line with the performance measurement cycle, usually monthly or at the end of each iteration. It is updated outside that cycle when an event significantly changes the assumptions, such as a supplier failure.
Should a forecast be a single value or a range?
A range with the key assumptions is more honest, because every forecast is uncertain. Reports often also give a most likely value so that decision-makers have a clear point of reference.
Source and context
- Reference
- PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition
- PMBOK Guide – Eighth Edition
Cite this entry
Forecast. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/forecast/
Forecast (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/forecast/ (retrieved 24 November 2026)
@misc{forecast,
title = {Forecast},
note = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
url = {https://pmdecoder.com/en/glossary/forecast/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/forecast/"> <p>Reasoned projection of how a project’s costs, dates or scope will develop, updated whenever new data become available.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/forecast/">Forecast</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer> </blockquote>
Found a mistake? Let us know, we check every report.