Free float
Definition
Free float is the flexibility an activity has with respect to its immediate successors. It indicates how far the activity can move or extend without any successor having to start later than its early start date and without violating a schedule constraint. It is calculated from the gap between the early finish date of the activity and the early start of the following activity, or the smallest gap where there are several successors. Free float can never be greater than total float.
Equivalents in other frameworks
Concept Scheduling flexibility relative to successors · three frameworks reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| general | Free float | equivalent | — |
| Scrum | — | no counterpart | — |
| Kanban | — | no counterpart | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Free float
- Topic area
- Network planning
Distinction
Free float corresponds to the German freier Puffer in network planning. Total float relates to the project end: using it up does not threaten the end date but removes flexibility from subsequent activities. Free float, by contrast, can be consumed without affecting any other activity. A deliberately planned time reserve is not float but a buffer in the sense of a reserve.
In practice
In a conversion project, electrical installation in the annex has five days of total float but only two days of free float, because drywall work follows immediately. When the electrician asks for three more days, the project manager knows that the end date will hold but the drywall contractor will have to start one day later, and agrees the dates with both firms.
Frequently asked questions
Why is free float useful for control?
It shows which delays do not trigger a chain reaction. Within free float, the project manager can move dates without having to inform other parties.
Do activities on the critical path have free float?
Usually not. Because they have no total float and free float cannot be larger, their free flexibility is also zero.
Source and context
- Reference
- PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition
- PMBOK Guide – Eighth Edition
Cite this entry
Free float. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/free-float-pmi/
Free float (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/free-float-pmi/ (retrieved 24 November 2026)
@misc{freefloatpmi,
title = {Free float},
note = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
url = {https://pmdecoder.com/en/glossary/free-float-pmi/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/free-float-pmi/"> <p>Leeway an activity has relative to its immediate successors: how far it can shift before any of them has to start later.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/free-float-pmi/">Free float</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer> </blockquote>
Found a mistake? Let us know, we check every report.