Workaround
Definition
In PMI terms, a workaround is a quick, temporary response to a problem that has already occurred. It is used when no response had been prepared for the event, for instance because the risk was not identified or was deliberately accepted passively, or when the planned response did not work. The workaround is meant to limit damage and keep work going but usually does not resolve the cause. It is therefore recorded, and a permanent solution follows, often through a corrective action or a change request.
Equivalents in other frameworks
Concept Unplanned makeshift solution to an occurring problem · three frameworks reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| general | Workaround | equivalent | — |
| Scrum | — | no counterpart | — |
| Kanban | — | no counterpart | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Workaround
- Topic area
- Risks and opportunities
Distinction
The term corresponds to the cross-framework concept of a workaround. A contingency plan is prepared in advance and implemented on a defined trigger; a workaround is improvised. A corrective action brings performance permanently back into line with the plan, whereas a workaround merely bridges the gap. Frequent workarounds point to gaps in risk identification.
In practice
The day before a series of training sessions, the learning platform fails, a risk that nobody had recorded. The project manager has the materials sent out as files and puts the exercises on a shared drive. The sessions go ahead. Afterwards the cause is investigated and the risk is added to the risk register.
Frequently asked questions
Is a workaround a sign of poor planning?
Not necessarily. Not every risk can be foreseen, and passively accepted risks lead to workarounds by design. Frequent workarounds, however, should prompt a review of risk work.
What happens after a workaround?
It is documented, the cause is clarified and a permanent solution is agreed. The experience feeds into lessons learned.
Source and context
- Reference
- PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition
- PMBOK Guide – Eighth Edition
Cite this entry
Workaround. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/workaround-pmi/
Workaround (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/workaround-pmi/ (retrieved 24 November 2026)
@misc{workaroundpmi,
title = {Workaround},
note = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
url = {https://pmdecoder.com/en/glossary/workaround-pmi/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/workaround-pmi/"> <p>Unplanned, short-term fix for a problem that no response was prepared for or for which the prepared response has failed.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/workaround-pmi/">Workaround</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer> </blockquote>
Found a mistake? Let us know, we check every report.