Change request

Definition

At PMI, a change request is a formal request to change a project document, a deliverable or a baseline. It describes what is to be changed, why, and what impact on scope, schedule, cost, quality and risks is expected. Change requests go through change control and are recorded in the change log. In the process-based editions, PMI assigned several types to change requests: corrective action, preventive action, defect repair and updates to documents or plans. In principle, any stakeholder can submit one.

Equivalents in other frameworks

Concept Formal request to change what was agreed · one framework reviewed

Equivalents of Change request in other frameworks
FrameworkTerm thereRelationNote
ISO 21506Change requestequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Change request

Distinction

The PMI term is equivalent to “Änderungsantrag” (change request) according to ISO 21506, the lead term of the concept in the glossary. A change request is not the change itself but the request for it. An issue describes a problem that has occurred; whether it leads to a change request depends on the chosen solution.

In practice

While a trade fair stand is being built, the customer asks for a larger video wall. The project manager records a change request with the supplier’s quotation, additional power connections and one extra day for assembly. The customer approves the additional costs in writing, and the order with the supplier is amended.

Frequently asked questions

Who may submit a change request?

In principle, any stakeholder. What matters is that the request is fully documented and assessed and decided through the defined process rather than implemented on demand.

Is a corrective action also a change request?

In PMI’s understanding it can be. If a corrective action requires intervention in baselines or released results, it is submitted and decided as a change request.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Change request. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/change-request-pmi/

Short form

Change request (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/change-request-pmi/ (retrieved 24 November 2026)

BibTeX
@misc{changerequestpmi,
  title   = {Change request},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/change-request-pmi/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/change-request-pmi/">
  <p>Formal application that submits a desired change, with reasons and likely effects, to change control for a decision.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/change-request-pmi/">Change request</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.