Definition of Done
abbr. DoD
Definition
The Definition of Done determines when work on the product counts as finished. It describes in binding terms which quality requirements a result must meet and is the commitment that belongs to the Increment. As soon as a Product Backlog item fulfils all criteria, it counts as an Increment. Until then, it may be neither released nor presented in the Sprint Review; it goes back into the Product Backlog instead. If the organization specifies a Definition of Done, it applies to all Scrum Teams as a minimum standard; otherwise the team sets a suitable one. If several teams work on one product, the same Definition of Done applies to all of them.
Equivalents in other frameworks
Concept Criteria for a finished result · three frameworks reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK | Acceptance criteria | partially overlapping | serves as the quality standard for every Increment of a product, not for an individual deliverable |
| PM² | Deliverables Acceptance Management Plan | partially overlapping | plan that, in addition to the criteria, also defines the steps, responsibilities and dates of acceptance |
| general | Acceptance criteria | partially overlapping | serves as the quality standard for every Increment of a product, not for an individual deliverable |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Definition of Done
- Topic area
- Scope and requirements
Distinction
Acceptance criteria apply to a single deliverable or item and describe what it must do. The Definition of Done, by contrast, applies equally to all items and describes quality characteristics such as tested, documented and releasable. The Definition of Ready, which some teams use in addition, is not part of the Scrum Guide.
In practice
The Definition of Done of a team that looks after a university website comprises seven points: the editorial team has approved the content, all pages are accessible, texts are available in German and English, loading time stays below two seconds, changes are described in the version history, automated tests pass without errors, and the data protection team has reviewed new forms. A degree programme page without an English version therefore does not count as finished.
Frequently asked questions
Can the Definition of Done change?
Yes. Teams often sharpen it in the Sprint Retrospective, for example when defects show that a quality criterion is missing. A standard set by the organization remains the lower limit.
What happens to work that does not meet the Definition of Done?
It is not part of the Increment and is not presented in the Sprint Review. The corresponding item goes back to the Product Backlog and is reordered there.
Source and context
- Reference
- Scrum Guide 2020, Abschnitt Commitment: Definition of Done
- Edition
- Scrum Guide 2020
- Author
- Dennis Hain
Differences from other editions
- Scrum Guide 2017
- The name was Definition of “Done”, with quotation marks. It was covered in the section on the transparency of the artifacts and was not yet a commitment attached to the Increment.
Cite this entry
Hain, D. (n.d.). Definition of Done. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/definition-of-done/
Hain, D. (n.d.): Definition of Done. PMDecoder, entry on Scrum Guide 2020, Abschnitt Commitment: Definition of Done. https://pmdecoder.com/en/glossary/definition-of-done/ (retrieved 24 November 2026)
@misc{definitionofdone,
author = {Hain, Dennis},
title = {Definition of Done},
note = {PMDecoder, Scrum Guide 2020, Abschnitt Commitment: Definition of Done},
url = {https://pmdecoder.com/en/glossary/definition-of-done/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/definition-of-done/"> <p>Binding description of the quality a result must reach to count as an Increment; the commitment belonging to the Increment</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/definition-of-done/">Definition of Done</a>, PMDecoder, Scrum Guide 2020, Abschnitt Commitment: Definition of Done</footer> </blockquote>
Found a mistake? Let us know, we check every report.