Cost variance
Definition
Cost variance, abbreviated CV, indicates in PMI’s earned value method by how much the work performed was more or less expensive than budgeted. It is calculated by subtracting actual cost from earned value. A negative value means an overrun, a positive value an underrun and zero an exact match. The CV can be determined for a reporting period or cumulatively and always applies as of the data date. At project completion it equals the difference between the budget at completion and the actual total cost.
Equivalents in other frameworks
Concept Difference between earned value and actual cost · three frameworks reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| ISO 21506 | Cost variance | equivalent | — |
| Scrum | — | no counterpart | — |
| Kanban | — | no counterpart | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Cost variance
- Topic area
- Monitoring and control
Distinction
“Kostenabweichung” (cost variance) according to ISO 21506, the lead term of the concept in the glossary, is equivalent. Cost variance is an absolute value; the cost performance index relates the same quantities as a ratio. Schedule variance compares earned value with planned value, and variance at completion looks ahead to the expected end of the project.
In practice
For the conversion of a canteen, the work package “ventilation” is budgeted at 50,000 euros and half complete. Earned value is therefore 25,000 euros, while 31,000 euros has been paid so far. Cost variance is minus 6,000 euros. The site management finds that more expensive fire dampers were installed and clarifies whether these extra costs are covered by the client’s budget.
Frequently asked questions
Why compare costs with earned value rather than planned value?
Because planned value contains the scheduled progress. Comparing it with costs would mix delay and overrun. Earned value credits exactly the work for which the costs were incurred.
How meaningful is cost variance on its own?
Of limited value. The same amount weighs more heavily in a small project than in a large one. It is therefore usually considered together with the cost performance index and percentage thresholds.
Source and context
- Reference
- PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition
- PMBOK Guide – Eighth Edition
Cite this entry
Cost variance. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/cost-variance-pmi/
Cost variance (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/cost-variance-pmi/ (retrieved 24 November 2026)
@misc{costvariancepmi,
title = {Cost variance},
note = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
url = {https://pmdecoder.com/en/glossary/cost-variance-pmi/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/cost-variance-pmi/"> <p>Budget deviation at a status date, found by subtracting actual cost from earned value (CV = EV − AC).</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/cost-variance-pmi/">Cost variance</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer> </blockquote>
Found a mistake? Let us know, we check every report.