Iteration
Definition
In PMI usage an iteration is a time-limited cycle of development on a product or deliverable in which all the work needed to deliver value is performed. This includes planning, analysis, design, implementation and testing of a selected slice. Iterations are usually short, often one to four weeks, and follow one another at the same rhythm. At the end there is a result that can be reviewed and on which feedback is gathered; the next iteration is then planned. Iterations are the basic building block of adaptive approaches but also occur in hybrid projects. The fixed length creates a reliable cadence for planning, coordination and delivery.
Equivalents in other frameworks
Concept Time-boxed work cycle · three frameworks reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| general | Iteration | equivalent | — |
| Scrum | Sprint | closely related | one month at most, with a Sprint Goal and fixed events; contains all the work up to the Increment |
| Kanban | — | no counterpart | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
All designations of this concept side by side
Comparisons
Classification
- this term
- Iteration
- Topic area
- Approaches and agility
Distinction
The cross-framework term iteration refers to the same thing. The Sprint in Scrum is an iteration with fixed rules, events and a Sprint Goal. A timebox is more general: it limits any kind of activity in time, including a meeting. An iteration differs from a project phase by its short, recurring form.
In practice
A team builds a customer portal for an electricity supplier in three-week iterations. In the fourth iteration it delivers the consumption display and the invoice download, each tested and made available to the business in a test environment. The business’s comments feed into planning of the fifth iteration.
Frequently asked questions
May an iteration be extended if work is left over?
Usually not. The fixed length is precisely the point. Unfinished work is reassessed and, if needed, moved to a later iteration.
Must every iteration produce something releasable?
The aim is a result that can be tested and assessed. Whether it goes to users immediately is a separate decision about releases.
Source and context
- Reference
- PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition
- PMBOK Guide – Eighth Edition
Cite this entry
Iteration. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/iteration-pmi/
Iteration (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/iteration-pmi/ (retrieved 24 November 2026)
@misc{iterationpmi,
title = {Iteration},
note = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
url = {https://pmdecoder.com/en/glossary/iteration-pmi/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/iteration-pmi/"> <p>Time-limited development cycle in which all the work for a usable partial result is carried out.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/iteration-pmi/">Iteration</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer> </blockquote>
Found a mistake? Let us know, we check every report.