Mura

Definition

Mura denotes fluctuations in the process, such as strongly varying order volumes, irregular deliveries, work that piles up at the end of the month, or steps that take different lengths of time. Such fluctuations force buffers, overtime and idle time at once. In the Toyota Production System, mura is regarded as one of the three types of loss alongside muda and muri and often as their trigger. The main countermeasures are levelling production by volume and mix, an even pace and smaller work packages.

Equivalents in other frameworks

No equivalents have been recorded for this term yet.

Distinction

Mura describes the unevenness, muri the overburden that results from it at peak times, and muda the waste, such as waiting times in quiet phases. Production levelling is the method used to reduce mura in production. In Kanban, uneven flow becomes visible in fluctuating cycle times and varying throughput.

In practice

The accounts department of a construction company receives almost all subcontractor invoices in the last days of the month, because interim payments are agreed that way. Overtime is worked during this period, while there is little to do in the middle of the month. The company staggers the billing dates across the month, and the work is spread more evenly.

Frequently asked questions

Can mura be avoided entirely in projects?

No, because projects naturally have peaks, for example before milestones. They can, however, be flattened by splitting work into smaller packages and staggering dates.

Why is mura often overlooked?

Because on average everything appears fully utilized. Only a look at the course over time shows that phases of overload and idle time alternate.

Source and context

Cite this entry
APA

Mura. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/mura/

Short form

Mura (n.d.). PMDecoder. https://pmdecoder.com/en/glossary/mura/ (retrieved 24 November 2026)

BibTeX
@misc{mura,
  title   = {Mura},
  note    = {PMDecoder},
  url     = {https://pmdecoder.com/en/glossary/mura/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/mura/">
  <p>Japanese for unevenness: irregular distribution of work, volume or pace that causes alternating overload and idle time.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/mura/">Mura</a>, PMDecoder</footer>
</blockquote>

Found a mistake? Let us know, we check every report.