Risk breakdown structure
Definition
The risk breakdown structure (RBS) arranges the possible sources of risk in a hierarchy. At the top level there are broad areas, such as technical, organizational, commercial and external sources; below they are refined step by step, for example into requirements, technology, suppliers, regulations or weather. PMI uses the RBS mainly as a framework for risk identification, so that no sources are overlooked, and as a basis for risk categories. It can be defined organization-wide and tailored for each project, and is often specified in the risk management plan.
Equivalents in other frameworks
Concept Hierarchical breakdown of risk sources · three frameworks reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| ISO 21506 | Risk breakdown structure | equivalent | — |
| Scrum | — | no counterpart | — |
| Kanban | — | no counterpart | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Risk breakdown structure
- Topic area
- Risks and opportunities
Distinction
The term corresponds to the risk breakdown structure in ISO 21506. Unlike the work breakdown structure, the RBS does not break down work but cause areas. The risk register contains individual risks; the RBS provides the structure into which they can be slotted.
In practice
A municipal administration is preparing to move into a new office building. The project manager uses the RBS provided by the project management office, with the main branches technology, organization, legal and environment, and adds “public participation” to the environment branch. In the risk workshop, the team goes through the branches one by one and assigns each risk it finds to a branch.
Frequently asked questions
Does every project need its own RBS?
Not necessarily. Many organizations provide a standard RBS. The project adopts it and tailors it to its particular circumstances.
How does the RBS help with evaluation?
When risks are assigned to branches, it becomes visible where they cluster. This helps to tackle causes together instead of treating each risk separately.
Source and context
- Reference
- PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition
- PMBOK Guide – Eighth Edition
Cite this entry
Risk breakdown structure. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/risk-breakdown-structure-pmi/
Risk breakdown structure (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/risk-breakdown-structure-pmi/ (retrieved 24 November 2026)
@misc{riskbreakdownstructurepmi,
title = {Risk breakdown structure},
note = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
url = {https://pmdecoder.com/en/glossary/risk-breakdown-structure-pmi/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/risk-breakdown-structure-pmi/"> <p>Layered classification of conceivable risk sources, e.g. technical, organizational, commercial and external, used as a grid for identifying risks.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/risk-breakdown-structure-pmi/">Risk breakdown structure</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer> </blockquote>
Found a mistake? Let us know, we check every report.