Expert judgement

also: Expert estimate

Definition

Expert judgement draws on the knowledge of people who are familiar with a subject, a technology, an industry or a type of undertaking. It is used where data are missing or insufficient, for example in estimates, the assessment of risks, the selection of solutions or the evaluation of bids. The experts may come from within the organization, from partners, from associations or from external consultancies.

Equivalents in other frameworks

Concept Judgement by experts · one framework reviewed

Equivalents of Expert judgement in other frameworks
FrameworkTerm thereRelationNote
PMI / PMBOKExpert judgmentequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Expert judgement

Distinction

Expert judgement is a source of information, not a calculation method; structured techniques such as the Delphi method make it more robust. Historical data are based on measured values, expert judgement on experience and assessment. An expert opinion (Gutachten) is a formal, usually written and reasoned form of expert judgement.

In practice

For the refurbishment of a listed town hall, there are no comparable projects in-house. The city therefore brings together a conservator, an experienced site manager from another heritage project and a structural engineer. Independently of one another, they estimate the duration of the facade refurbishment and then discuss the differences. The joint estimate, with a range, is fed into the schedule, and the assumptions are documented.

Frequently asked questions

How can expert judgements be made more robust?

Through several independent experts, documented assumptions, ranges instead of single values and structured techniques that limit mutual influence.

What are the weaknesses of expert judgement?

It can be distorted by experience that does not transfer, by optimism or by the interests of those consulted. Disclosed assumptions help to detect this.

Source and context

Cite this entry
APA

Hain, D. (n.d.). Expert judgement. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/expert-judgement/

Short form

Hain, D. (n.d.): Expert judgement. PMDecoder. https://pmdecoder.com/en/glossary/expert-judgement/ (retrieved 24 November 2026)

BibTeX
@misc{expertjudgement,
  author  = {Hain, Dennis},
  title   = {Expert judgement},
  note    = {PMDecoder},
  url     = {https://pmdecoder.com/en/glossary/expert-judgement/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/expert-judgement/">
  <p>Assessment by people with particular expertise or experience, used in planning, estimating and decision-making in a project</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/expert-judgement/">Expert judgement</a>, PMDecoder</footer>
</blockquote>

Found a mistake? Let us know, we check every report.