Product Backlog

Definition

The Product Backlog collects everything that, according to current knowledge, should make a product better, and puts it in order. It is the only place from which a Scrum Team takes its work. The list is never complete: new insights from Sprint Reviews, from users or from the market lead to new, changed or deleted items. At the top are the items that are clear and small enough for the team to complete within one Sprint. The Product Goal is part of the Product Backlog and gives it direction. The Product Owner is accountable for content and order; the Developers estimate the size of the items.

Equivalents in other frameworks

Concept Hierarchical decomposition of project scope · four frameworks reviewed

Equivalents of Product Backlog in other frameworks
FrameworkTerm thereRelationNote
ISO 21506Work breakdown structurepartially overlappingalso decomposes the scope, but ordered by value rather than hierarchically
ISO 21506Product breakdown structurepartially overlappingbreaks down the result into sub-products instead of the work into work packages
PMI / PMBOKWork breakdown structurepartially overlappingalso decomposes the scope, but ordered by value rather than hierarchically
PRINCE2Product Breakdown Structurepartially overlappingBreakdown into products rather than work; corresponds to the product breakdown structure under ISO 21506.

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

Broader term
Scrum Artifact
this term
Product Backlog

Distinction

A work breakdown structure divides the project scope hierarchically and as completely as possible at the outset. The Product Backlog, by contrast, is ordered by value and urgency and is continuously updated. A requirements specification describes requirements as a contractual basis; the Product Backlog is a working tool that may change with every Sprint. The Sprint Backlog contains only the part that the Developers have selected for the current Sprint.

In practice

For software that plans duty rosters in care homes, the Product Backlog contains around 120 items. At the top are well-described points such as swapping shifts between two nurses; further down are rough ideas such as a link to payroll. After a change in the law on rest periods, the Product Owner moves the check of the minimum rest period to the top, and the team refines the item in the following week.

Frequently asked questions

Who may add items to the Product Backlog?

Suggestions can come from anyone, including stakeholders. However, the Product Owner is accountable for content and order and may delegate the creation of items.

Must the Product Backlog be complete before work begins?

No. It is enough if the top items are clear enough for the next Sprint. The rest emerges and changes as the work proceeds.

Source and context

Reference
Scrum Guide 2020, Abschnitt Product Backlog
Edition
Scrum Guide 2020

Differences from other editions

Scrum Guide 2017
The guide did not treat a Product Goal as a fixed part of the Product Backlog. The list gathered everything to be changed in the product for future releases, from new features and requirements to improvements and bug fixes, and at least at every Sprint Review the Product Owner checked how much work was still open towards a goal.
Cite this entry
APA

Hain, D. (n.d.). Product Backlog. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/product-backlog/

Short form

Hain, D. (n.d.): Product Backlog. PMDecoder, entry on Scrum Guide 2020, Abschnitt Product Backlog. https://pmdecoder.com/en/glossary/product-backlog/ (retrieved 24 November 2026)

BibTeX
@misc{productbacklog,
  author  = {Hain, Dennis},
  title   = {Product Backlog},
  note    = {PMDecoder, Scrum Guide 2020, Abschnitt Product Backlog},
  url     = {https://pmdecoder.com/en/glossary/product-backlog/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/product-backlog/">
  <p>Ordered, continuously evolving list of all work intended to improve a product, and the Scrum Team's single source of work</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/product-backlog/">Product Backlog</a>, PMDecoder, Scrum Guide 2020, Abschnitt Product Backlog</footer>
</blockquote>

Found a mistake? Let us know, we check every report.