Tollgate

Definition

A tollgate is a review at the transition between two phases of a Six Sigma project. The team presents what it has achieved in the completed phase and shows that the expected results are in place, such as an agreed project charter after Define or confirmed causes after Analyze. The champion, often together with the process owner and a Master Black Belt, reviews these results and decides whether the project moves into the next phase, is reworked, redirected or ended. Tollgates thus create fixed opportunities to review resources and priorities and prevent a project from continuing without a sound basis.

Equivalents in other frameworks

Concept Decision point between project phases · six frameworks reviewed

Equivalents of Tollgate in other frameworks
FrameworkTerm thereRelationNote
ISO 21506Gateclosely relatedbetween the phases of the DMAIC cycle
PMI / PMBOKPhase gateclosely relatedbetween the phases of the DMAIC cycle
PM²Phase Gateclosely relatedbetween the phases of the DMAIC cycle
PRINCE2Managing a stage boundarypartially overlappingThe Project Manager’s preparation of the decision point; the decision itself is taken by the Project Board.
Scrum—no counterpartcontinuation is decided continuously in the Sprint Review
Kanban—no counterpart—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Tollgate

Distinction

In essence the tollgate corresponds to the gate in ISO 21506 and the PMI phase gate. It is, however, tied to the five DMAIC phases, and its review questions concern the data and evidence of the improvement project rather than budget and schedule. A regular status meeting does not replace it, because no approval of the next phase takes place there.

In practice

After the Measure phase a Green Belt presents the error rate in order entry to the champion. The Master Black Belt notices that two sites count errors differently. The champion does not yet release the Analyze phase and allows two weeks to align the definition and collect the data again.

Frequently asked questions

Can a project be ended at a tollgate?

Yes. If it turns out, for example, that the problem is smaller than assumed or a simple solution is already enough, stopping is a sensible decision and not a failure.

Who prepares a tollgate?

The project lead, usually a Black Belt or Green Belt. They compile the results of the phase and name open issues and risks for the next phase.

Source and context

Cite this entry
APA

Tollgate. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/tollgate/

Short form

Tollgate (n.d.). PMDecoder. https://pmdecoder.com/en/glossary/tollgate/ (retrieved 24 November 2026)

BibTeX
@misc{tollgate,
  title   = {Tollgate},
  note    = {PMDecoder},
  url     = {https://pmdecoder.com/en/glossary/tollgate/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/tollgate/">
  <p>Formal review at the end of each DMAIC phase at which the champion decides whether the Six Sigma project continues, changes course or stops.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/tollgate/">Tollgate</a>, PMDecoder</footer>
</blockquote>

Found a mistake? Let us know, we check every report.