Kaizen event

also: Kaizen workshop

Definition

A kaizen event usually lasts a few days and concentrates on a clearly bounded process or area. A mixed team of staff from the area and a few outsiders is released from its usual work for this purpose. After preparation with a goal, scope and data, the team records the current state on site, looks for causes, designs improvements and implements them on a trial basis while the event is still running. At the end it presents the results, and open items are followed up with owners and dates. The event complements everyday improvement work but does not replace it.

Equivalents in other frameworks

No equivalents have been recorded for this term yet.

Classification

Broader term
Kaizen
this term
Kaizen event

Distinction

Kaizen in the narrower sense means continuous small improvements in everyday work; the kaizen event concentrates the work into a short period. An improvement project following DMAIC in Six Sigma usually takes months and relies more heavily on statistical analysis. A sprint retrospective is a regular event of a team and not a separate effort.

In practice

The goods receiving store of a hospital takes up to two days to get deliveries to the wards. A team from the store, nursing and purchasing spends four days in the store, follows deliveries, reorganizes the receiving area and introduces fixed distribution rounds. By the last day, deliveries already reach the wards on the same day; after four weeks the team checks whether the improvement is holding.

Frequently asked questions

Why do the results of kaizen events sometimes fizzle out?

Usually because follow-up and standards are missing. Without clear responsibility for open items and a review after a few weeks, the old process returns.

Who should take part in a kaizen event?

Above all people who work in the process under review, supplemented by people from neighbouring areas and someone experienced in facilitating such events.

Source and context

Cite this entry
APA

Kaizen event. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/kaizen-event/

Short form

Kaizen event (n.d.). PMDecoder. https://pmdecoder.com/en/glossary/kaizen-event/ (retrieved 24 November 2026)

BibTeX
@misc{kaizenevent,
  title   = {Kaizen event},
  note    = {PMDecoder},
  url     = {https://pmdecoder.com/en/glossary/kaizen-event/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/kaizen-event/">
  <p>Short, tightly scoped improvement effort in which a team analyses, changes and trials a process over a few days.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/kaizen-event/">Kaizen event</a>, PMDecoder</footer>
</blockquote>

Found a mistake? Let us know, we check every report.