Quality practice

Definition

The quality practice describes how a PRINCE2 project ensures that its products are fit for their purpose. It has two parts. In quality planning, the customer’s quality expectations and the acceptance criteria for the overall result are recorded, and quality criteria, checking methods and responsibilities are defined for each important product. In quality control, the products are checked against these requirements, the results are documented and approvals are obtained. The basis is the quality management approach, the project product description and the product descriptions; the checks themselves are tracked in a register.

Equivalents in other frameworks

Concept Planning, assuring and controlling quality · one framework reviewed

Equivalents of Quality practice in other frameworks
FrameworkTerm thereRelationNote
generalQuality managementclosely relatedRelated to the products of a project, divided into quality planning and quality control.

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Other terms

Other words for the same thing in English usage. Not to be confused with the equivalents above, which translate between frameworks.

Quality theme
deprecated

Classification

this term
Quality practice
Topic area
Quality

Distinction

General quality management usually concerns the whole organization. The quality practice relates to the products of a single project. PRINCE2 separates quality assurance, which checks independently of the project whether the organization’s standards are being met, from project assurance, through which the project board forms its own view of the project.

In practice

For a new claims form at an insurance company, the senior user agrees that customers must be able to complete the form without help in no more than ten minutes. This criterion is included in the project product description. For the sub-product “completion guide”, the product description specifies that five test persons from the customer base check it. The test results are recorded before the senior user approves the product.

Frequently asked questions

Who defines the quality expectations?

The user side, represented by the senior user. They know what the result is needed for. The supplier side contributes what can be achieved with the means provided.

Is a checked product automatically approved?

No. The check shows whether the criteria are met; approval is a separate decision by the persons named for it, based on the check results.

Source and context

Reference
PRINCE2 7, Praktik Qualität
Edition
PRINCE2 7
Cite this entry
APA

Hain, D. (n.d.). Quality practice. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/quality-practice/

Short form

Hain, D. (n.d.): Quality practice. PMDecoder, entry on PRINCE2 7, Praktik Qualität. https://pmdecoder.com/en/glossary/quality-practice/ (retrieved 24 November 2026)

BibTeX
@misc{qualitypractice,
  author  = {Hain, Dennis},
  title   = {Quality practice},
  note    = {PMDecoder, PRINCE2 7, Praktik Qualität},
  url     = {https://pmdecoder.com/en/glossary/quality-practice/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/quality-practice/">
  <p>PRINCE2 7 practice that sets out how quality requirements for the products are defined, checked and evidenced.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/quality-practice/">Quality practice</a>, PMDecoder, PRINCE2 7, Praktik Qualität</footer>
</blockquote>

Found a mistake? Let us know, we check every report.