Verification
Definition
Verification checks whether something has been built or produced as described. The basis is specifications, drawings or requirements documents; the means are tests, measurements, inspections, calculations or reviews. In simple terms, the question is: did we build the product right? The result is documented so that the fulfilment of each requirement can be traced.
Equivalents in other frameworks
Concept Evidence that requirements are met · one framework reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK | Verification | equivalent | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Verification
- Topic area
- Quality
Distinction
Validation asks whether the result is fit for its actual purpose, that is, whether the right product was built. A result can be verified and still fail validation if the requirements did not describe the need correctly. Acceptance is the contractual declaration, which often builds on verification and validation.
In practice
For a new access control system in a data centre, the requirements specification lists 60 requirements, such as an opening time of less than one second and the logging of every entry. Verification assigns a test to each requirement, carries it out and enters the result in an evidence list. Two requirements are not met because logging loses entries during a power failure. The manufacturer makes corrections, and the test is repeated.
Frequently asked questions
How is the fulfilment of a requirement demonstrated?
By test, inspection, analysis or demonstration. Which method applies should already be settled when the requirement is written.
Who carries out verification?
Often the contractor itself, supplemented for critical requirements by independent inspectors or the client.
Source and context
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Verification. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/verification/
Hain, D. (n.d.): Verification. PMDecoder. https://pmdecoder.com/en/glossary/verification/ (retrieved 24 November 2026)
@misc{verification,
author = {Hain, Dennis},
title = {Verification},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/verification/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/verification/"> <p>Confirmation, through objective evidence, that a result fulfils the specified requirements</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/verification/">Verification</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.