Lessons Log

Definition

In PRINCE2 the Lessons Log is the running collection of experience that is useful for the current project or for future ones. It is created during start-up, because PRINCE2 requires projects to learn from earlier undertakings at the outset: insights from comparable projects in the organization or elsewhere are entered first. During the project the team’s own observations are added, such as what worked well, what caused difficulties and what lay behind it. An entry describes the lesson, its trigger, its effect and a recommendation. The Project Manager is responsible for the log; anyone involved in the project can contribute. The Lessons Log puts the principle of learning from experience into practice and is the source for Lessons Reports.

Equivalents in other frameworks

Concept Captured lessons from projects · four frameworks reviewed

Equivalents of Lessons Log in other frameworks
FrameworkTerm thereRelationNote
ISO 21506Lessons learnedpartially overlappingLog in which lessons are collected during the project.
PMI / PMBOKLessons learnedpartially overlappingLog in which lessons are collected during the project.
PM²Project-End Reportpartially overlappingcontains lessons learned, but also reports on the performance and outcome of the project
ScrumSprint Retrospectivepartially overlappingcontinually improves the way the team works instead of documenting lessons for other initiatives

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Lessons Log
Topic area
Closing

Distinction

Lessons learned in ISO 21506 or at PMI refer to the insights themselves; the Lessons Log is the working tool in which PRINCE2 records them during the project. The Lessons Report evaluates selected entries and passes them on to the organization or to other projects. A Sprint Retrospective in Scrum is an event, not a log, even though its results may be recorded in one.

In practice

Before a municipal utility starts switching to smart electricity meters, the project manager reviews the closure documents of a similar project at a neighbouring supplier. He enters in the Lessons Log that many appointments there fell through because customers were informed too late. In his own project, after the first month, he adds that announcements by letter work considerably better than by email. Both entries shape the communication plan for the next stage.

Frequently asked questions

Why is the Lessons Log created at the very start?

PRINCE2 expects a project to draw on existing experience from the beginning. Lessons from earlier undertakings are therefore gathered during start-up and taken into account in planning.

What happens to the entries at the end of the project?

Entries that are valuable for other projects or the organization are summarized by the Project Manager in a Lessons Report. The log itself is archived with the other project records.

Source and context

Reference
PRINCE2 7, Managementprodukte
Edition
PRINCE2 7
Cite this entry
APA

Hain, D. (n.d.). Lessons Log. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/lessons-log/

Short form

Hain, D. (n.d.): Lessons Log. PMDecoder, entry on PRINCE2 7, Managementprodukte. https://pmdecoder.com/en/glossary/lessons-log/ (retrieved 24 November 2026)

BibTeX
@misc{lessonslog,
  author  = {Hain, Dennis},
  title   = {Lessons Log},
  note    = {PMDecoder, PRINCE2 7, Managementprodukte},
  url     = {https://pmdecoder.com/en/glossary/lessons-log/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/lessons-log/">
  <p>PRINCE2 log in which a project collects experience from earlier undertakings and its own insights, to apply them or pass them on.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/lessons-log/">Lessons Log</a>, PMDecoder, PRINCE2 7, Managementprodukte</footer>
</blockquote>

Found a mistake? Let us know, we check every report.