Competence element: Compliance, standards and regulations

Definition

This competence element deals with the rules that act on a project from outside or inside. They include laws and regulations, contracts, intellectual property rights, rules on occupational safety, health and the environment, professional codes of conduct and technical standards. Compliance means ensuring that such requirements are actually met, whether they are mandatory or voluntary. The ICB expects those responsible for projects to identify the relevant requirements, take sustainability goals into account, deliberately select and further develop professional standards, and compare and improve the project management capability of their own organization against others. The element comprises six key competence indicators.

Equivalents in other frameworks

No equivalents have been recorded for this term yet.

Classification

Broader term
Perspective
this term
Competence element: Compliance, standards and regulations

Distinction

The element is no substitute for legal advice: it is about recognizing the relevant requirements and organizing compliance with them. Project management standards such as ISO 21500 appear here as standards a project can use. It overlaps with the competence element Quality where standards set requirements for processes or results.

In practice

For the construction of a data centre, the project manager first compiles the requirements that apply: building law, fire protection, data protection, the client's efficiency targets and its code of conduct for suppliers. She assigns a responsible person to each requirement and adds the checks to the milestone approvals. After the project, she compares with two other sites how waste heat is used there.

Frequently asked questions

Is sustainability part of this element?

Yes. The ICB counts principles and goals of sustainable action among the requirements a project should know and take into account, alongside law, occupational safety and professional rules.

Why is the organization's project management capability also relevant?

Because standards should not only be complied with but also developed further. The ICB envisages comparing one's own organization with others and deriving improvements from this.

Source and context

Reference
IPMA ICB 4.0, Abschnitt 4.3.3
Edition
IPMA Individual Competence Baseline 4.0
Cite this entry
APA

Competence element: Compliance, standards and regulations. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/competence-element-compliance-standards-and-regulations/

Short form

Competence element: Compliance, standards and regulations (n.d.). PMDecoder, entry on IPMA ICB 4.0, Abschnitt 4.3.3. https://pmdecoder.com/en/glossary/competence-element-compliance-standards-and-regulations/ (retrieved 24 November 2026)

BibTeX
@misc{competenceelementcompliancestandardsandregulations,
  title   = {Competence element: Compliance, standards and regulations},
  note    = {PMDecoder, IPMA ICB 4.0, Abschnitt 4.3.3},
  url     = {https://pmdecoder.com/en/glossary/competence-element-compliance-standards-and-regulations/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/competence-element-compliance-standards-and-regulations/">
  <p>ICB 4 perspective competence: identifying and meeting legal, professional and ethical requirements for a project and using them for the organization</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/competence-element-compliance-standards-and-regulations/">Competence element: Compliance, standards and regulations</a>, PMDecoder, IPMA ICB 4.0, Abschnitt 4.3.3</footer>
</blockquote>

Found a mistake? Let us know, we check every report.