Resource management plan

Definition

In PMI usage, the resource management plan is a component of the project management plan. It describes how the project handles its resources, covering both the team and physical resources such as materials, equipment or premises. Typical contents are the approach to identifying needs, the routes for acquisition and release, roles and responsibilities, the project organization, rules for onboarding, development and recognition of the team, the handling of overallocation, and the monitoring of availability and consumption. Scope and level of detail depend on the size and nature of the project. The plan is not a list of specific assignments but defines the rules by which they are made.

Equivalents in other frameworks

Concept Determining resource needs and deployment · one framework reviewed

Equivalents of Resource management plan in other frameworks
FrameworkTerm thereRelationNote
generalResource planningpartially overlappingdenotes the plan containing the rules for acquiring, deploying and releasing resources

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Resource management plan

Distinction

The resource management plan covers the concept of resource planning only in part: it is the document that records the rules of resource planning, not the planning activity itself or its results such as assignment plans and histograms. The resource breakdown structure and the responsibility assignment matrix are separate documents to which the plan may refer.

In practice

For a research project with three partner institutes, the resource management plan specifies that each institute nominates its own staff, while laboratory equipment is allocated centrally through a booking calendar. It states that bottlenecks for measuring instruments are decided in the monthly coordination meeting and that new team members receive a safety briefing within two weeks. When one institute withdraws a doctoral student, the replacement procedure described there is applied.

Frequently asked questions

Do team development and recognition belong in the resource management plan?

In PMI’s understanding, yes. The plan deals not only with quantities and times but also with how the team is developed, involved and released again, insofar as this matters for the project.

Does every project need its own resource management plan?

Every project needs rules for the use of resources, but not necessarily a separate document. In small projects a few provisions in the project management plan or references to organizational standards are often sufficient.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Resource management plan. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/resource-management-plan/

Short form

Resource management plan (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/resource-management-plan/ (retrieved 24 November 2026)

BibTeX
@misc{resourcemanagementplan,
  title   = {Resource management plan},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/resource-management-plan/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/resource-management-plan/">
  <p>Subsidiary plan for dealing with the team and physical resources, from determining needs and acquiring them to tracking their use.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/resource-management-plan/">Resource management plan</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.