Learn from experience principle

Definition

The learn from experience principle requires the PRINCE2 project management team to seek, record and act on lessons. This applies at three points in time: when the project starts up, the team checks what previous or similar projects have taught; while the project runs, new lessons are captured and taken into account; and at closure, lessons are prepared so that future projects can benefit. Because projects are unique and are often carried out by teams with little shared history, learning is treated as a deliberate task rather than an afterthought. Responsibility lies with everyone involved, not only with the project manager.

Equivalents in other frameworks

Concept Captured lessons from projects · four frameworks reviewed

Equivalents of Learn from experience principle in other frameworks
FrameworkTerm thereRelationNote
ISO 21506Lessons learnedpartially overlappingPrinciple of using lessons at the start, throughout and at the end, not the lessons themselves.
PMI / PMBOKLessons learnedpartially overlappingPrinciple of using lessons at the start, throughout and at the end, not the lessons themselves.
PM²Project-End Reportpartially overlappingcontains lessons learned, but also reports on the performance and outcome of the project
ScrumSprint Retrospectivepartially overlappingcontinually improves the way the team works instead of documenting lessons for other initiatives

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Learn from experience principle
Topic area
Closing

Distinction

Lessons learned in the sense of ISO 21506 and PMI are the captured insights themselves. The PRINCE2 principle describes the duty to use such insights from the very beginning, not only to collect them at the end. The Sprint Retrospective in Scrum is a recurring event for improving collaboration; the principle is broader and does not prescribe a particular format.

In practice

Before starting a project to introduce a new inventory management system, the project manager talks to two colleagues who ran a similar project at another site. They report that data cleansing was badly underestimated there. The lesson feeds into planning: data cleansing becomes a separate work package with adequate contingency.

Frequently asked questions

Why is learning a principle of its own in PRINCE2?

Because projects are temporary and their teams disband afterwards. Without an explicit rule, experience is easily lost and the same mistakes recur in the next project.

Where are lessons recorded in PRINCE2?

PRINCE2 provides dedicated management products for this, a log for ongoing lessons and a report that passes them on in digested form. Their format can be tailored to the project.

Source and context

Reference
PRINCE2 7, Grundprinzipien
Edition
PRINCE2 7
Cite this entry
APA

Hain, D. (n.d.). Learn from experience principle. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/learn-from-experience-principle/

Short form

Hain, D. (n.d.): Learn from experience principle. PMDecoder, entry on PRINCE2 7, Grundprinzipien. https://pmdecoder.com/en/glossary/learn-from-experience-principle/ (retrieved 24 November 2026)

BibTeX
@misc{learnfromexperienceprinciple,
  author  = {Hain, Dennis},
  title   = {Learn from experience principle},
  note    = {PMDecoder, PRINCE2 7, Grundprinzipien},
  url     = {https://pmdecoder.com/en/glossary/learn-from-experience-principle/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/learn-from-experience-principle/">
  <p>PRINCE2 principle: lessons from earlier and current projects are sought, recorded and applied throughout the project.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/learn-from-experience-principle/">Learn from experience principle</a>, PMDecoder, PRINCE2 7, Grundprinzipien</footer>
</blockquote>

Found a mistake? Let us know, we check every report.