Story point

Definition

In PMI usage a story point is a unitless measure used in the relative estimation of user stories. The team compares a story with stories already known and assigns it a number that expresses effort, complexity and uncertainty together. A modified Fibonacci sequence is often used for this, as the increasing gaps reflect the growing imprecision with larger stories. The story points a team has completed in past iterations give its velocity, which serves as the basis for planning future iterations. Story points are only meaningful within one team, because each team develops its own reference scale.

Equivalents in other frameworks

Concept Relative size unit for agile work items · one framework reviewed

Equivalents of Story point in other frameworks
FrameworkTerm thereRelationNote
generalStory pointequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Story point

Distinction

The cross-framework term story point refers to the same measure. Unlike person-days or hours, story points do not describe an absolute amount of time. Planning poker is a technique teams use to agree on story points together, not the unit itself. The sum of story points serves as the basis for charts such as the burndown chart.

In practice

A team agrees as a reference that adding a filter to a list is worth 2 story points. It estimates the story “Export the list as a spreadsheet” at 3 by comparison, and a story to connect an external payment service at 13. As 13 points are too many for one iteration, this story is split before planning.

Frequently asked questions

Can story points be converted into hours?

This is not advisable. As soon as points are translated into hours, the benefit of relative estimation is lost and the discussion shifts to time targets.

Can teams be compared by story points?

No. Each team has its own scale. Comparing the velocity of different teams leads to wrong conclusions and often to artificially inflated estimates.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Story point. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/story-point-pmi/

Short form

Story point (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/story-point-pmi/ (retrieved 24 November 2026)

BibTeX
@misc{storypointpmi,
  title   = {Story point},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/story-point-pmi/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/story-point-pmi/">
  <p>Unitless measure with which a team estimates the size of user stories relative to one another.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/story-point-pmi/">Story point</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.