Critical path method

Definition

The critical path method, CPM for short, is the standard technique for calculating dates from a network of activities. It is based on the activities, their estimated durations and the logical relationships between them. The forward pass determines the early start and finish dates, the backward pass the late dates. The difference yields total float and free float, and the activities without flexibility form the critical path. The method thus shows the shortest possible project duration and where scheduling has room to move. It was developed in industry in the late 1950s.

Equivalents in other frameworks

Concept Calculation method for dates and float · three frameworks reviewed

Equivalents of Critical path method in other frameworks
FrameworkTerm thereRelationNote
generalCritical path methodequivalent—
Scrum—no counterpart—
Kanban—no counterpart—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Critical path method

Distinction

In German the technique is called Methode des kritischen Wegs. The critical path method works with a single duration per activity; PERT, by contrast, uses three estimates and thereby reflects uncertainty. The critical chain method builds on similar logic but takes resource constraints into account and plans pooled buffers. The precedence diagramming method describes how the network is drawn; CPM describes how to calculate within it.

In practice

An organizer is planning a professional conference with 40 activities, from selecting speakers to printing the programme. After durations and dependencies have been entered, the scheduling tool calculates according to the critical path method and shows that the conference can take place in 22 weeks at the earliest. The desired date is 20 weeks away; from the negative float, the project manager immediately sees which activities must be accelerated.

Frequently asked questions

Is a scheduling tool needed for the critical path method?

Small networks can be calculated by hand or in a spreadsheet. With many activities and frequent changes, a tool is practically indispensable because it recalculates the dates at every update.

Does the critical path method take resources into account?

Not directly. The calculation assumes unlimited resources. Constraints are then handled with techniques such as resource leveling, which can change the critical path.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Critical path method. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/critical-path-method-pmi/

Short form

Critical path method (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/critical-path-method-pmi/ (retrieved 24 November 2026)

BibTeX
@misc{criticalpathmethodpmi,
  title   = {Critical path method},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/critical-path-method-pmi/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/critical-path-method-pmi/">
  <p>Calculation technique that derives early and late dates, float and the critical path from durations and dependencies.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/critical-path-method-pmi/">Critical path method</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.