Time and materials contract

Definition

At PMI, the time and materials contract is a hybrid that combines features of the cost-reimbursable and the fixed-price contract. As with cost reimbursement, the total value is open when the contract is concluded and grows with the effort. As with a fixed price, however, the unit rates are agreed in advance, such as an hourly rate per qualification or prices for materials. Often a ceiling on the contract value and a term are set so that costs do not rise without limit. The contract type is frequently used for reinforcement by external specialists or when the scope cannot be described quickly.

Equivalents in other frameworks

Concept Contract billed by effort · three frameworks reviewed

Equivalents of Time and materials contract in other frameworks
FrameworkTerm thereRelationNote
generalTime and materials contractequivalent—
Scrum—no counterpart—
Kanban—no counterpart—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Time and materials contract

Distinction

The PMI term is equivalent to the cross-framework term “Time-and-Material-Vertrag” (time and materials contract), which represents the concept in the glossary; PMI spelling uses the plural “materials” without hyphens. Unlike a cost-reimbursable contract, no actual costs are documented; agreed rates are charged instead.

In practice

A software company provides a client with two developers to connect a legacy system. Billing is monthly by the hour at the agreed rate, capped at 400 hours. When it becomes clear that the ceiling will be reached, the client decides on the basis of the time sheets whether to increase it or take over the remaining scope itself.

Frequently asked questions

How does the buyer limit its cost risk under a time and materials contract?

With a ceiling on value or hours, a limited term and regular records of the work performed. A clear description of objectives also helps, so that the effort does not grow indefinitely.

Who bears the risk under a time and materials contract?

The quantity risk lies with the buyer, who pays for every hour. The seller bears the risk that its actual costs exceed the agreed rates.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Time and materials contract. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/time-and-materials-contract-pmi/

Short form

Time and materials contract (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/time-and-materials-contract-pmi/ (retrieved 24 November 2026)

BibTeX
@misc{timeandmaterialscontractpmi,
  title   = {Time and materials contract},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/time-and-materials-contract-pmi/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/time-and-materials-contract-pmi/">
  <p>Contract type mixing features of fixed-price and cost-reimbursable deals: hours worked are billed at agreed rates, plus materials used.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/time-and-materials-contract-pmi/">Time and materials contract</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.