Pull system
Definition
In a pull system, work is not assigned as soon as it arises but pulled when capacity becomes free. The Kanban Guide describes the pull system as a consequence of limiting work in progress: the members only start a new work item when a clear signal shows that they can handle it, for example because less work is in progress than the agreed limit allows. They should avoid pulling more items into a part of the process than are allowed there. Pulling or selecting new work thus becomes a deliberate decision. A pull system reduces waiting times and overload and makes visible where work is piling up.
Equivalents in other frameworks
Concept Starting work only on demand or when capacity is free · one framework reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| Lean | Pull principle | closely related | In Kanban applied to knowledge work; the signal results from limiting work in progress rather than from consumption at downstream stages. |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
All designations of this concept side by side
Comparisons
Classification
- Broader term
- Kanban practices
- this term
- Pull system
- Topic area
- Approaches and agility
Distinction
In a push system, work is fed into a process according to plan or on request, regardless of whether capacity is available. The pull principle of lean management and the Toyota Production System controls the replenishment of materials in the same way; there, kanban cards were originally the signals that triggered replenishment.
In practice
In an advertising agency, new client jobs used to land directly with the graphic designers, who often had ten jobs in parallel. The agency introduces a pull system: jobs wait in a "ready" column, and a designer only pulls a new one when one of his or her three jobs at most moves on to client review. Account management can now see how many jobs are waiting and can give clients realistic dates.
Frequently asked questions
Who decides which item is pulled?
The members of the Kanban system, according to the agreed policies, for example by urgency or value. The Kanban Guide does not prescribe any particular order.
Are there exceptions to pulling?
Possibly, but they should be explicitly agreed. The Kanban Guide requires permitted exceptions to the limit on work in progress to be included in the Definition of Workflow.
Source and context
- Reference
- Kanban Guide 2025.5, Abschnitt Actively Managing Items in a Workflow
- Edition
- The Kanban Guide, May 2025
Differences from other editions
- The Kanban Guide, December 2020
- The guide presented the pull system as a by-product of the WIP limits. Pulling more items than the limit allowed was intended only in rare cases and with the agreement of the members.
Cite this entry
Pull system. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/pull-system/
Pull system (n.d.). PMDecoder, entry on Kanban Guide 2025.5, Abschnitt Actively Managing Items in a Workflow. https://pmdecoder.com/en/glossary/pull-system/ (retrieved 24 November 2026)
@misc{pullsystem,
title = {Pull system},
note = {PMDecoder, Kanban Guide 2025.5, Abschnitt Actively Managing Items in a Workflow},
url = {https://pmdecoder.com/en/glossary/pull-system/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/pull-system/"> <p>Way of working in which new work is only started when a clear signal shows free capacity; in Kanban it results from limiting work in progress</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/pull-system/">Pull system</a>, PMDecoder, Kanban Guide 2025.5, Abschnitt Actively Managing Items in a Workflow</footer> </blockquote>
Found a mistake? Let us know, we check every report.