High-level schedule
also: Summary schedule, Outline schedule
Definition
The high-level schedule represents a project in just a few lines: phases or subprojects, key milestones and the most important dependencies. It is often created as early as initiation, when details are still missing, and serves sponsors and governance bodies as a basis for decisions. As the project proceeds, it remains in place as a summarized view of the detailed schedule.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Classification
- this term
- High-level schedule
- Topic area
- Scheduling
Distinction
The high-level schedule shows the framework, the detailed schedule the individual activities. A milestone plan contains only points in time, whereas the high-level schedule also contains periods. In German construction, Rahmenterminplan is often used synonymously, but sometimes also for a binding schedule requirement set by the client.
In practice
Before a district decides on building a new vocational school, the administration presents a high-level schedule on a single page: twelve months of design, nine months of permits and tendering, two years of construction and three months of fitting out. It also notes that grant funds must be drawn down by a certain date. The district council sees that there is hardly any slack and decides to prepare the tendering in parallel with the design.
Frequently asked questions
How binding is a high-level schedule?
Binding as a point of reference, but not in detail. It is important to state the uncertainty openly, for example with ranges instead of fixed dates.
Who creates the high-level schedule?
Usually the designated project manager, drawing on experience and discussions with experts.
Source and context
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). High-level schedule. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/high-level-schedule/
Hain, D. (n.d.): High-level schedule. PMDecoder. https://pmdecoder.com/en/glossary/high-level-schedule/ (retrieved 24 November 2026)
@misc{highlevelschedule,
author = {Hain, Dennis},
title = {High-level schedule},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/high-level-schedule/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/high-level-schedule/"> <p>Concise schedule showing phases, milestones and main work, created early in the project and refined later</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/high-level-schedule/">High-level schedule</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.