Fixed-price contract

Definition

Under a fixed-price contract, buyer and seller agree on a fixed price for a defined scope. The seller must deliver even if its costs turn out higher than calculated; the cost risk lies with the seller. PMI names common forms: firm fixed price without adjustment, fixed price incentive fee with an incentive for cost, schedule or performance targets, and fixed price with economic price adjustment, which allows price changes over long terms, for example based on an index. A clearly described scope is a prerequisite.

Equivalents in other frameworks

Concept Contract with a pre-agreed price · three frameworks reviewed

Equivalents of Fixed-price contract in other frameworks
FrameworkTerm thereRelationNote
generalFixed-price contractequivalent—
Scrum—no counterpart—
Kanban—no counterpart—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Fixed-price contract

Distinction

In the glossary, “Festpreisvertrag” (fixed-price contract) represents the concept across frameworks; the PMI term is equivalent. Under a cost-reimbursable contract the buyer mainly bears the cost risk; under a time and materials contract billing is based on effort. Changes in scope almost always lead to renegotiation under a fixed-price contract.

In practice

A municipality awards the renewal of the heating system in a sports hall. The bill of quantities and drawings are complete. The installation firm offers a fixed price and wins the contract. When it has to replace additional pipework during the work that was not in the bill of quantities, it submits a claim, which is negotiated separately.

Frequently asked questions

When is a fixed-price contract suitable?

When the scope is stable and precisely described and the seller can calculate costs reliably. With unclear requirements, sellers include high risk premiums or disputes arise.

Is a fixed price always cheaper for the buyer?

Not necessarily. The seller prices in its risk, and changes become expensive through claims. The main benefit is the predictability of expenditure.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Fixed-price contract. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/fixed-price-contract-pmi/

Short form

Fixed-price contract (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/fixed-price-contract-pmi/ (retrieved 24 November 2026)

BibTeX
@misc{fixedpricecontractpmi,
  title   = {Fixed-price contract},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/fixed-price-contract-pmi/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/fixed-price-contract-pmi/">
  <p>Contract type in which one set price is agreed for precisely described work, however high the seller’s costs turn out to be.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/fixed-price-contract-pmi/">Fixed-price contract</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.