Minimum viable product

Definition

In PMI’s understanding a minimum viable product, abbreviated MVP, is a concept for deciding what a solution's first release should contain: only as many features are built as are needed for the solution to be genuinely usable for its users and to generate feedback. The purpose is twofold. Customers receive value early, and the team learns with little effort whether its basic assumptions about need and solution are correct. On the basis of these insights a decision is taken on how the product will be developed further, whether the course will change or whether the undertaking will end. The MVP is thus a means of reducing risk early in uncertain undertakings.

Equivalents in other frameworks

Concept Simplest product version for learning · one framework reviewed

Equivalents of Minimum viable product in other frameworks
FrameworkTerm thereRelationNote
generalMinimum viable productequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Minimum viable product

Distinction

The cross-framework term minimum viable product refers to the same thing. A prototype often only serves to try out an idea and need not be fit for use; an MVP is used by real users. The MVP differs from the first increment of an iteration in that it is based on the smallest worthwhile scope for a release to the market or to users.

In practice

A municipal utility is considering an app for charging electric cars. Instead of developing reservations, billing and route planning at the same time, the team first releases a version that shows available charging points and lets users start a charging session. After eight weeks the usage data show that the availability display is in particular demand; reservations are postponed.

Frequently asked questions

How small may an MVP be?

As small as possible, but not smaller than needed for real value. A solution that nobody can use sensibly provides no useful feedback.

Is an MVP only suitable for software products?

No. Services, processes or physical products can also be tried out in a first lean version, for example as a pilot offer for a small group of customers.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Minimum viable product. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/minimum-viable-product-pmi/

Short form

Minimum viable product (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/minimum-viable-product-pmi/ (retrieved 24 November 2026)

BibTeX
@misc{minimumviableproductpmi,
  title   = {Minimum viable product},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/minimum-viable-product-pmi/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/minimum-viable-product-pmi/">
  <p>First version of a solution with the smallest set of features that delivers real value and allows useful feedback.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/minimum-viable-product-pmi/">Minimum viable product</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.