Supplier selection

also: Vendor selection, Source selection

Definition

Supplier selection compares suppliers against criteria that have been defined and weighted in advance. Besides price, these include technical suitability, references, quality of the proposed solution, schedule reliability, financial stability, service and sustainability. Evaluation matrices, presentations, trial installations or reference visits are frequently used. The decision and its reasons are documented.

Equivalents in other frameworks

No equivalents have been recorded for this term yet.

Classification

this term
Supplier selection

Distinction

Tendering is the procedure in which bids are obtained; supplier selection is the evaluation step that follows. Supplier evaluation during ongoing operations assesses existing suppliers on their actual performance. Weighted scoring (Nutzwertanalyse) is a frequently used tool for selection, not the selection itself.

In practice

For a new warehouse management system, a logistics company compares four bids in a matrix: functionality 35 per cent, costs over five years 30 per cent, references 15 per cent, implementation concept 20 per cent. The two highest-ranked suppliers set up a trial installation with real item data. This shows that the system with the most points has weaknesses in order picking with handheld scanners. After consulting the warehouse staff, the choice falls on the second supplier.

Frequently asked questions

Why should the criteria be fixed before the bids are opened?

So that the evaluation remains traceable and fair and is not tailored after the event to a preferred bid.

Who should be involved in the selection?

Purchasing, future users, experts in technology and operations, and the project manager, so that all essential perspectives are taken into account.

Source and context

Cite this entry
APA

Hain, D. (n.d.). Supplier selection. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/supplier-selection/

Short form

Hain, D. (n.d.): Supplier selection. PMDecoder. https://pmdecoder.com/en/glossary/supplier-selection/ (retrieved 24 November 2026)

BibTeX
@misc{supplierselection,
  author  = {Hain, Dennis},
  title   = {Supplier selection},
  note    = {PMDecoder},
  url     = {https://pmdecoder.com/en/glossary/supplier-selection/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/supplier-selection/">
  <p>Evaluation of bids and potential suppliers against defined criteria to determine the most suitable contractual partner</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/supplier-selection/">Supplier selection</a>, PMDecoder</footer>
</blockquote>

Found a mistake? Let us know, we check every report.