Cycle Time
also: Flow time
Definition
Cycle Time measures how much time has passed between the start and the completion of a work item. The members define start and finish in the Definition of Workflow; a team's cycle time can therefore only be compared with values from the same workflow. As one of the four flow metrics, it shows how long work actually takes, including all waiting times. The collected values of past items form the basis of the Service Level Expectation. Their spread reveals a lot about the workflow: if the values lie far apart, forecasts are uncertain, and it is worth looking for causes such as blockers or very different items. Teams may also call the metric something else, such as flow time.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Classification
- Broader term
- Flow metrics
- this term
- Cycle Time
Distinction
In German, Durchlaufzeit is used partly for cycle time and partly for lead time, which already starts when a request is received. Which span is meant depends in Kanban solely on the start and end points in the Definition of Workflow. The activity duration in a schedule is a planned quantity, cycle time a measured one.
In practice
A team that builds websites for hotels measures cycle time from receipt of all content to going live. Most sites take between five and nine days, but some take more than 25. The analysis shows that the long cases are all multilingual. From now on, the team handles them as a separate type of work item with its own Service Level Expectation.
Frequently asked questions
Do weekends count towards cycle time?
The Kanban Guide speaks of elapsed time and does not specify a counting method. Many teams measure in calendar days, others in working days; what matters is sticking to one method.
How does cycle time differ from Work Item Age?
Cycle time concerns completed items and is only known at the end. Work Item Age measures how long items in progress have been under way so far.
Source and context
- Reference
- Kanban Guide 2025.5, Abschnitt Flow Metrics
- Edition
- The Kanban Guide, May 2025
Cite this entry
Cycle Time. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/cycle-time/
Cycle Time (n.d.). PMDecoder, entry on Kanban Guide 2025.5, Abschnitt Flow Metrics. https://pmdecoder.com/en/glossary/cycle-time/ (retrieved 24 November 2026)
@misc{cycletime,
title = {Cycle Time},
note = {PMDecoder, Kanban Guide 2025.5, Abschnitt Flow Metrics},
url = {https://pmdecoder.com/en/glossary/cycle-time/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/cycle-time/"> <p>Flow metric in Kanban: the time elapsed between the start and the finish of a completed work item</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/cycle-time/">Cycle Time</a>, PMDecoder, Kanban Guide 2025.5, Abschnitt Flow Metrics</footer> </blockquote>
Found a mistake? Let us know, we check every report.