Measure phase
Definition
In the Measure phase the team establishes how well the process actually performs today. It decides which quantities are measured, how each one is precisely defined and where the data come from. Before data are evaluated, the team checks whether the measurement method is reliable, because inaccurate measurement leads to wrong conclusions. The data yield the baseline, such as a defect rate, a sigma level or an average lead time with its variation. Possible influencing factors are often collected at the same time so that the analysis can build on them. The tollgate checks whether the data are sufficient for the search for causes.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Classification
- Broader term
- DMAIC
- this term
- Measure phase
Distinction
The Measure phase measures the current state of the process, not the progress of the project; it should not be confused with progress measurement or earned value management. It differs from the Analyze phase in that it describes how the process behaves, whereas the analysis explains why.
In practice
An online retailer investigates incorrectly packed shipments. The team defines a shipment as defective if an item is missing, surplus or swapped. Two inspectors assess the same samples independently to check the consistency of their judgement. Over four weeks a defect rate of 1.8 per cent emerges, recorded by warehouse, shift and product group.
Frequently asked questions
Why check the measurement method first?
Otherwise it remains unclear whether differences in the data come from the process or from the measurement. Unreliable measurement can hide real improvements or produce apparent successes.
Are existing data from IT systems enough?
Often as a starting point. They are, however, checked for completeness and suitable definitions and supplemented by the team’s own data collection where needed.
Source and context
- Reference
- ISO 13053-1:2011
- Edition
- ISO 13053-1:2011 (DMAIC methodology)
Cite this entry
Measure phase. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/measure-phase/
Measure phase (n.d.). PMDecoder, entry on ISO 13053-1:2011. https://pmdecoder.com/en/glossary/measure-phase/ (retrieved 24 November 2026)
@misc{measurephase,
title = {Measure phase},
note = {PMDecoder, ISO 13053-1:2011},
url = {https://pmdecoder.com/en/glossary/measure-phase/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/measure-phase/"> <p>Second DMAIC phase: the current performance of the process is captured with verified data and recorded as the baseline for the project goal.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/measure-phase/">Measure phase</a>, PMDecoder, ISO 13053-1:2011</footer> </blockquote>
Found a mistake? Let us know, we check every report.