Program

Definition

In PMI usage, a program is a group of related projects, program activities and subsidiary programs whose coordinated management yields benefits that separate management of each would not deliver. The components depend on one another in terms of content, timing or shared resources and together contribute to an overarching goal. A program usually runs for a longer period than a project; its components may start and finish in sequence or in parallel. PMI describes programs in a separate standard for program management.

Equivalents in other frameworks

Concept Group of related projects with a shared objective · three frameworks reviewed

Equivalents of Program in other frameworks
FrameworkTerm thereRelationNote
ISO 21506Programmeequivalent—
Scrum—no counterpart—
Kanban—no counterpart—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Program

Distinction

The term corresponds to programme in the standard; PMI uses the American spelling. A large project is not yet a program: what matters is that several components together generate additional benefits. A portfolio, by contrast, may contain independent undertakings linked only by strategy and resources. Unlike a project, which produces deliverables, a program is oriented towards benefits.

In practice

A regional transport association wants to transform public transport in its region. The program comprises projects for a new fare system, a timetable app, the procurement of electric buses and the conversion of two depots. Each project delivers its own result, but only together do they produce the intended benefit: more passengers with lower emissions. The program manager coordinates schedules and interfaces between the projects.

Frequently asked questions

When is it worth managing projects as a program?

When they are closely related, draw on shared resources and can only achieve the intended benefits together. Without such links, management within the portfolio is usually sufficient.

Does a program have a fixed end?

A program is temporary, but its end often depends on when the benefits are achieved and handed over to operations. Its duration is therefore less precisely defined at the outset than that of a project.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Program. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/program/

Short form

Program (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/program/ (retrieved 24 November 2026)

BibTeX
@misc{program,
  title   = {Program},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/program/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/program/">
  <p>Interdependent projects and related work steered jointly because coordinated management yields benefits that separate management could not.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/program/">Program</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.