Project

Definition

In PMI’s terms a project is a temporary endeavour that aims to bring about a unique product, result or service. Temporary means that it has a defined start and end; the end is reached when the objectives have been met, when they can no longer be met or when the need no longer exists. Being temporary applies to the endeavour, not necessarily to its results, which may last for a long time. Unique means that the result differs from earlier ones in essential respects, even if individual activities are repeated. PMI also stresses that projects are meant to drive change in organizations and create value.

Equivalents in other frameworks

Concept Unique, time-limited endeavour with its own objective · one framework reviewed

Equivalents of Project in other frameworks
FrameworkTerm thereRelationNote
ISO 21506Projectequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Project
Topic area
Fundamentals

Distinction

The term corresponds in substance to the ISO term project; both emphasize uniqueness and a limited duration. A project differs from ongoing operations in that it is not set up to last. A program groups several related projects whose combined benefits could not be achieved individually; a portfolio brings together projects, programs and other work to implement strategy.

In practice

A university wants to replace its examination management system. University management sets up an endeavour with a fixed start in January and a planned finish after the summer semester of the following year, and appoints a project manager and a budget. Operating the new system afterwards is not part of the project but is handed over to central IT.

Frequently asked questions

Is a recurring annual financial close a project?

No. It is repeated every year following the same pattern and belongs to ongoing operations. Introducing a new closing procedure, on the other hand, can be a project.

Does a project need a minimum size?

PMI does not set a size limit. Many organizations, however, define their own thresholds above which an undertaking is run as a project with its own organization and planning.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Project. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/project-pmi/

Short form

Project (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/project-pmi/ (retrieved 24 November 2026)

BibTeX
@misc{projectpmi,
  title   = {Project},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/project-pmi/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/project-pmi/">
  <p>Time-limited undertaking that produces something new, whether a product, a service or another result.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/project-pmi/">Project</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.