Project Product Description

Definition

In PRINCE2, the project product description describes the project’s main product, that is, what is to be handed over at the end. It states the purpose and composition of the overall output, the quality expectations of the customer and user side, the acceptance criteria with their tolerances, how acceptance takes place and the persons responsible for it. It is created while the project is being prepared, as part of the project brief, refined during initiation and becomes part of the project initiation documentation. At project closure, it is checked whether the output meets the acceptance criteria. It is also the starting point of the product breakdown structure.

Equivalents in other frameworks

Concept Totality of results and work to be delivered · two frameworks reviewed

Equivalents of Project Product Description in other frameworks
FrameworkTerm thereRelationNote
ISO 21506Project scopepartially overlappingDescribes the overall output with quality expectations and acceptance criteria, not the work.
PMI / PMBOKProject scopepartially overlappingDescribes the overall output with quality expectations and acceptance criteria, not the work.

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Project Product Description

Distinction

An ordinary product description concerns a single product, the project product description the output of the whole project. It overlaps with project scope under ISO 21506 but describes the result rather than the work. A requirements specification can supplement it but does not replace it.

In practice

For the new website of a music school, the project product description records: the website comprises the course programme, online registration and teacher profiles. Parents should be able to complete a registration in five minutes, and the pages should be accessible. Acceptance is by the school management after a test with ten parents. These criteria are fixed before detailed planning begins.

Frequently asked questions

Why is the project product description created so early?

Because without a shared understanding of the final result, neither costs nor benefits can be estimated sensibly. It is therefore already part of the project brief.

Who defines the acceptance criteria?

Mainly the user side, which will later work with the result. The project board agrees to them as part of the project initiation documentation.

Source and context

Reference
PRINCE2 7, Managementprodukte
Edition
PRINCE2 7
Cite this entry
APA

Hain, D. (n.d.). Project Product Description. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/project-product-description/

Short form

Hain, D. (n.d.): Project Product Description. PMDecoder, entry on PRINCE2 7, Managementprodukte. https://pmdecoder.com/en/glossary/project-product-description/ (retrieved 24 November 2026)

BibTeX
@misc{projectproductdescription,
  author  = {Hain, Dennis},
  title   = {Project Product Description},
  note    = {PMDecoder, PRINCE2 7, Managementprodukte},
  url     = {https://pmdecoder.com/en/glossary/project-product-description/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/project-product-description/">
  <p>Special form of the PRINCE2 product description for the project’s overall output, with quality expectations and acceptance criteria.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/project-product-description/">Project Product Description</a>, PMDecoder, PRINCE2 7, Managementprodukte</footer>
</blockquote>

Found a mistake? Let us know, we check every report.