Story point

Definition

Story points express how large an item is in relation to others. The team compares effort, complexity and uncertainty and assigns a point value, usually from a series based on the Fibonacci sequence such as 1, 2, 3, 5, 8 and 13. An item with eight points is considered roughly four times as large as one with two. The values cannot be converted into hours and are only comparable within a team, because each team develops its own scale. From the total of points completed in previous iterations, the velocity, teams derive how much they are likely to achieve in future.

Equivalents in other frameworks

Concept Relative size unit for agile work items · one framework reviewed

Equivalents of Story point in other frameworks
FrameworkTerm thereRelationNote
PMI / PMBOKStory pointequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Story point

Distinction

An effort estimate in person-days or hours is absolute and can be converted directly into costs; story points are relative. This makes quick estimates easier but comparisons between teams harder. Story points are not part of the Scrum Guide, which leaves open how sizes are determined. Other options include T-shirt sizes or simply counting items.

In practice

A team developing a booking system for sports classes chooses a simple item as its reference, changing the profile address, and gives it two points. Connecting a payment service is given 13 points in Planning Poker, because it is unclear how well its interface is documented. Over the last four Sprints, the team has completed an average of 30 points and therefore plans no more than this amount.

Frequently asked questions

Why do teams estimate in points rather than hours?

Relative sizes can usually be judged more reliably than absolute durations. Points also direct attention to the task rather than to who completes it and how quickly.

Are story points suitable for assessing performance?

This is generally advised against. Because each team has its own scale, point totals say nothing about productivity, and pressure on the figures quickly leads to inflated estimates.

Source and context

Cite this entry
APA

Hain, D. (n.d.). Story point. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/story-point/

Short form

Hain, D. (n.d.): Story point. PMDecoder. https://pmdecoder.com/en/glossary/story-point/ (retrieved 24 November 2026)

BibTeX
@misc{storypoint,
  author  = {Hain, Dennis},
  title   = {Story point},
  note    = {PMDecoder},
  url     = {https://pmdecoder.com/en/glossary/story-point/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/story-point/">
  <p>Relative unit used by agile teams to estimate the size, effort, complexity and uncertainty of items in comparison with one another</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/story-point/">Story point</a>, PMDecoder</footer>
</blockquote>

Found a mistake? Let us know, we check every report.